Laserfiche WebLink
3. Elevations, sections, profiles, and details as needed to describe all natural and <br />artificial features of the project. <br />4. Proposed grade contours at one -foot intervals shown as solid lines. <br />5. An estimate of the total volume (cubic yards) of materials proposed to be imported to <br />or exported from the site. <br />6. Provisions for groundwater management (dewatering), including subsurface drains, <br />disposals, ponding and flood controls. <br />7. Spot elevations at drainage break points and directional arrows indicating site swale <br />and lot drainage. <br />8. Proposed lot lines, lot and block numbers, building style, building pad location and <br />elevations at the lowest floor and garage slab, if applicable, for each lot. <br />9. Locations, sizes, grades, rim and invert elevations of all proposed stormwater <br />facilities, including ponds, proposed to serve the subject property. <br />10. The location of all oversize, non -typical easements including conservation easements, <br />if applicable. <br />11. Show the boundary of the 100 year flood elevations of all waterbodies. <br />12. Locations of all stormwater management practices, infiltration areas, and areas not to <br />be disturbed during construction. <br />13. Normal water level, high water level, and emergency overflow elevations for the site <br />and all associated ponding systems. <br />14. Location of areas where construction will be phased to minimize duration of exposed <br />soil areas. Include map and calculations as necessary of areas of grubbing, clearing, tree removal, <br />grading, excavation, fill, and other disturbance; areas of soil or earth material storage; quantities <br />of soil or earth material to be removed, placed, stored, or otherwise moved on site, and <br />delineated limits of disturbance. <br />15. Location and type of all temporary and permanent erosion prevention, sediment <br />control, stormwater runoff, and soil stabilization BMPs, along with procedures to be used to <br />establish additional temporary BMPs as necessary for the site conditions during construction. <br />Standard plates and/or specifications for the BMP's used on the project must be included in the <br />final plans and specifications for the project. Location and design of temporary sediment basins <br />where ten acres or more (five acres or more for special or impaired waters) are disturbed and <br />drained to a single point. When site restrictions do not allow for a temporary sediment basin or <br />less than the required acreage is being developed, temporary sediment basins where appropriate <br />DRAFT ORD 09-15 CHAPTER 1011STORMWATER & ESC ORDINANCE.DOCX <br />13/29 <br />