My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2015-009 Council Ordinances
LinoLakes
>
City Council
>
City Council Ordinances
>
2015
>
2015-009 Council Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2016 11:21:02 AM
Creation date
1/19/2016 10:17:38 AM
Metadata
Fields
Template:
City Council
Council Document Type
Ordinances
Meeting Date
10/26/2015
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.,,- are encouraged, but not required in areas with steep slopes or highly erodible soils or to take <br />equivalent measures such as smaller basins, check dams, and vegetated buffer strips. <br />16. Methods to be used for final stabilization of all exposed soil areas. <br />17. Documentation that the project applicant has applied for the NPDES permit from the <br />Minnesota Pollution Control Agency (MPCA), when applicable. <br />18. A Stormwater Pollution Prevention Plan for projects that require an NPDES permit. <br />4) Construction activity requirements. Any activity subject to a permit under this chapter must <br />conform to the standards of the NPDES general permit regarding construction -site erosion and <br />sediment control. <br />5) Inspections. See also § 1101.012 Inspections and Maintenance of this chapter. <br />a. The applicant shall be responsible for inspection, maintenance and effectiveness of all <br />erosion and sediment control measures until final soil stabilization is achieved. <br />b. The City may inspect the project site and require the applicant to provide additional <br />erosion control measures as it determined conditions warrant. <br />6) Final stabilization. <br />a. Erosion and sediment control measures must be maintained until final vegetation and <br />ground cover is established to a density of 70%. <br />b. All temporary erosion and sediment control BMPs will be removed after all disturbed <br />areas have been permanently stabilized. <br />STORMWATER MANAGEMENT <br />§ 1011.011 STORMWATER MANAGEMENT REQUIREMENTS. <br />1) Stormwater management. A permit incorporating an approved stormwater management <br />plan shall be required for all proposed land development activity including public linear projects, <br />unless otherwise exempted in this chapter, which meets any or all of the following: <br />a. A development, redevelopment or reconstruction, except Public Linear Projects, that <br />creates or reconstructs 10,000 square feet or more of impervious surface, including smaller <br />individual sites that are part of a common plan of development that may be constructed at <br />different times. <br />DRAFT ORD 09-15 CHAPTER 1011STORMWATER & ESC ORDINANCE.DOCX <br />14/29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.