My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2015-009 Council Ordinances
LinoLakes
>
City Council
>
City Council Ordinances
>
2015
>
2015-009 Council Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2016 11:21:02 AM
Creation date
1/19/2016 10:17:38 AM
Metadata
Fields
Template:
City Council
Council Document Type
Ordinances
Meeting Date
10/26/2015
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c. Conveyance system. Wherever possible untreated and treated stormwater runoff shall be <br />conveyed in facilities open to the atmosphere (e.g. swales, vegetated buffer strips, energy - <br />dissipating structures, and the like) rather than through enclosed pipes, so as to decrease runoff <br />velocity, allow for natural infiltration, allow suspended sediment particles to settle, and to <br />remove pollutants. <br />d. Proposed development design shall: <br />1. Maintain or decrease runoff volume. <br />2. Decrease erosion and sedimentation. <br />3. Maintain or decrease flow frequency, duration, and peak runoff rates. <br />4. Increase infiltration (groundwater recharge) or filtration. <br />5. Maintain existing flow patterns. <br />6. Reduce time to peak flows by increasing the time of concentration to and through <br />storm sewers. <br />7. Provide storage of stormwater runoff on site. <br />8. Avoid channel erosion. <br />9. The proposed project must not adversely affect water level off the site during or after <br />construction. <br />10. The proposed activity may not reduce hydraulic efficiency of the drainage ways at <br />any point up -gradient of the applicant's parcel boundary. <br />e. Landlocked basins. A landlocked basin may be provided an outlet only if it: <br />1. Retains a hydrologic regime that complies with the requirements of the local <br />governmental unit (LGU) responsible for administration of the Wetland Conservation Act <br />(WCA); and <br />2. Provides sufficient dead storage volume to retain back to back 100 -year, 24-hour <br />rainfalls and runoff; and <br />3. Does not create adverse downstream flooding or water quality conditions as a result <br />of increased discharge rate or volume, or other factors. <br />f. All plans shall be consistent with National Pollutant Discharge Elimination permit <br />(NPDES) requirements, the Lino Lakes engineering design standards, the Lino Lakes stormwater <br />design standards, and the filing or approval requirements of Rice Creek Watershed District, <br />DRAFT ORD 09-15 CHAPTER 1011STORMWATER & ESC ORDINANCE.DOCX <br />16/29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.