Laserfiche WebLink
77TH .. .tET UTILITY EXTENSION r- ' <br />CITY OF LINO LAKES TOLTZ, KING, DUVALL, ANDERSON <br />LINO LAKES, MINNESOTA AND ASSOCIATES, INCORPORATED <br />ENGINEERS-ARCHITECTS-PLANNERS <br />COMMISSION NO. 10414-99A TABULATION OF BIDS <br />BIDS OPENED: SEPTEMBER 27, 1999 10:00 AM <br />ENGINEER'S ESTIMATE DAVE PERKINS CONTRACTING, INC PENN CONTRACTING, INC <br />*DENOTES ERROR IN BIDDERS CALCULATION <br />ITEM UNIT TOTAL UNIT TOTAL UNIT TOTAL <br />NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT <br />SANITARY SEWER <br />1 <br />MOBILIZATION <br />1.00 <br />LS <br />$ 10,000.00 <br />$ 10,000.00 <br />$ 2,500.00 <br />$ 2,500.00 <br />$ 4,000.00 <br />$ 4,000.00 <br />2 <br />CONNECT TO EXISTING SANITARY SEWER <br />1.00 <br />EA <br />$ 1,500.00 <br />$ 1,500.00 <br />$ 1,500.00 <br />$ 1,500.00 <br />$ 1,000.00 <br />$ 1,000.00 <br />3 <br />10" PVC, C-900 SANITARY SEWER <br />551.00 <br />LF <br />$ 27.00 <br />$ 14,877.00 <br />$ 26.00 <br />$ 14,326.00 <br />$ 24.80 <br />$ 13,664.80 <br />4 <br />CONSTRUCT 4' DIA. MH <br />4.00 <br />EA <br />$ 1,500.00 <br />$ 6,000.00 <br />$ 1,400.00 <br />$ 5,600.00 <br />$ 1,600.00 <br />$ 6,400.00 <br />5 <br />EXTRA DEPTH OF 4' DIA. MH <br />5.30 <br />LF <br />$ 85.00 <br />$ 450.50 <br />$ 100.00 <br />$ 530.00 <br />$ 140.00 <br />$ 742.00 <br />6 <br />4' ON 10' PVC, C-900 WYE BRANCH <br />5.00 <br />EA <br />$ 320.00 <br />$ 1,600.00 <br />$ 450.00 <br />$ 2,250.00 <br />$ 500.00 <br />$ 2,500.00 <br />7 <br />6" ON 10" PVC, C-900 WYE BRANCH <br />1.00 <br />EA <br />$ 350.00 <br />$ 350.00 <br />$ 500.00 <br />$ 500.00 <br />$ 510.00 <br />$ 510.00 <br />8 <br />4" PVC, C-900 SERVICE PIPE <br />115.00 <br />LF <br />$ 15.00 <br />$ 1,725.00 <br />$ 15.00 <br />$ 1,725.00 <br />$ 11.30 <br />$ 1,299.50 <br />9 <br />6' PVC, C-900 SERVICE PIPE <br />18.00 <br />LF <br />$ 18.00 <br />$ 324.00 <br />$ 25.00 <br />$ 450.00 <br />$ 17.00 <br />$ 306.00 <br />10 <br />TELEVISE SANITARY SEWER MAINS <br />551.00 <br />LF <br />$ 1.00 <br />$ 551.00 <br />$ 1.00 <br />$ 551.00 <br />$ 1.00 <br />$ 551.00 <br />SUBTOTAL - SANITARY SEWER <br />$ 37,377.50 <br />$ 29,932.00 <br />$ 30,973.30 <br />WATERMAIN <br />1 <br />CONNECT TO EXISTING WATERMAIN <br />1.00 <br />EA <br />$ 1,500.00 <br />$ 1,500.00 <br />$ 550.00 <br />$ 550.00 <br />$ 1,500.00 <br />$ 1,500.00 <br />2 <br />6" DIP, CL. 52 WATERMAIN <br />28.00 <br />LF <br />$ 16.00 <br />$ 448.00 <br />$ 25.00 <br />$ 700.00 <br />$ 17.30 <br />$ 484.40 <br />3 <br />8' DIP, CL. 52 WATERMAIN <br />545.00 <br />LF <br />$ 25.00 <br />$ 13,625.00 <br />$ 22.00 <br />$ 11,990.00 <br />$ 22.00 <br />$ 11,990.00 <br />4 <br />6' RES. SEAT GATE VALVE & BOX <br />2.00 <br />EA <br />$ 470.00 <br />$ 940.00 <br />$ 500.00 <br />$ 1,000.00 <br />$ 500.00 <br />$ 1,000.00 <br />5 <br />8' RES. SEAT GATE VALVE & BOX <br />1.00 <br />EA <br />$ 560.00 <br />$ 560.00 <br />$ 600.00 <br />$ 600.00 <br />$ 655.00 <br />$ 655.00 <br />6 <br />6" HYDRANT <br />1.00 <br />EA <br />$ 1,600.00 <br />$ 1,600.00 <br />$ 1,300.00 <br />$ 1,300.00 <br />$ 1,670.00 <br />$ 1,670.00 <br />7 <br />1" TYPE "K" WATER SERVICE <br />100.00 <br />LF <br />$ 12.00 <br />$ 1,200.00 <br />$ 7.00 <br />$ 700.00 <br />$ 9.00 <br />$ 900.00 <br />8 <br />1' CORPORATION STOP <br />5.00 <br />EA <br />$ 40.00 <br />$ 200.00 <br />$ 75.00 <br />$ 375.00 <br />$ 116.00 <br />$ 580.00 <br />9 <br />1" CURB STOP & BOX <br />5.00 <br />EA <br />$ 90.00 <br />$ 450.00 <br />$ 75.00 <br />$ 375.00 <br />$ 160.00 <br />$ 800.00 <br />10 <br />MJ FITTINGS <br />335.00 <br />LB <br />$ 2.50 <br />$ 837.50 <br />$ 4.00 <br />$ 1,340.00 <br />$ 1.40 <br />$ 469.00 <br />SUBTOTAL - WATERMAIN <br />$ 21,360.50 <br />$ 18,930.00 <br />$ 20,048.40 <br />STREETS & RESTORATION <br />1 <br />REMOVE & DISPOSE BIT. SURFACE <br />1380.00 <br />SY <br />$ 3.00 <br />$ 4,140.00 <br />$ 3.00 <br />$ 4,140.00 <br />$ 2.00 <br />$ 2,760.00 <br />2 <br />SAWCUT BITUMINOUS PAVEMENT (FULL DEPTH) <br />143.00 <br />LF <br />$ 2.00 <br />$ 286.00 <br />$ 3.00 <br />$ 429.00 <br />$ 2.00 <br />$ 286.00 <br />3 <br />1 1/2"-2350 TYPE LV 4 WEARING COURSE <br />150.00 <br />TN <br />$ 40.00 <br />$ 6,000.00 <br />$ 42.00 <br />$ 6,300.00 <br />$ 44.00 <br />$ 6,600.00 <br />4 <br />2"-2350 TYPE LV 3 NON-WEARING COURSE <br />200.00 <br />TN <br />$ 35.00 <br />$ 7,000.00 <br />$ 40.00 <br />$ 8,000.00 <br />$ 42.00 <br />$ 8,400.00 <br />5 <br />5' AGGREGATE BASE, CLASS 5 <br />530.00 <br />TN <br />$ 13.00 <br />$ 6,890.00 <br />$ 14.00 <br />$ 7,420.00 <br />$ 14.80 <br />$ 7,844.00 <br />6 <br />BIT. MATERIAL FOR TACK COAT <br />70.00 <br />GA <br />$ 2.00 <br />$ 140.00 <br />$ 3.00 <br />$ 210.00 <br />$ 2.50 <br />$ 175.00 <br />7 <br />TOPSOIL 4' DEPTH <br />220.00 <br />CY <br />$ 12.00 <br />$ 2,640.00 <br />$ 10.00 <br />$ 2,200.00 <br />$ 8.00 <br />$ 1,760.00 <br />8 <br />SODDING <br />1400.00 <br />SY <br />$ 4.00 <br />$ 5,600.00 <br />$ 3.00 <br />$ 4,200.00 <br />$ 2.60 <br />$ 3,640.00 <br />SUBTOTAL - STREETS & RESTORATION <br />$ 32,696.00 <br />$ 32,899.00 <br />$ 31,465.00 <br />TOTAL BID <br />$ 91,434.00 <br />$ 81,761.00 <br />$ 82,486.70 <br />• <br />BID TABULATION <br />Page 1 <br />