My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01-25-2016 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2016
>
01-25-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2016 1:39:20 PM
Creation date
2/23/2016 3:48:13 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
01/25/2016
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 00 73 00 <br />SUPPLEMENTARY CONDITIONS OF THE CONTRACT <br />The following supplements modify, change, delete from or add to the "General Conditions of the <br />Contract for Construction", AIA document A201, 2007. Where any article of the general <br />conditions is modified or any paragraph, subparagraph or clause thereof is modified or deleted <br />by these supplementary conditions, the unaltered provisions of that article, paragraph, <br />subparagraph shall remain in full effect. <br />ARTICLE 1 <br />"General Provisions" <br />Add to Article 1, General Provisions, the following: <br />1.2.4 In the event of conflicts or discrepancies among the contract documents, <br />interpretations will be based on the following priorities: (1) The Standard Form <br />of Agreement Between Owner and Contractor; (2) Change orders and <br />supplemental instructions; (3) Addenda, with those of later date have precedence <br />over those of earlier date; (4) The supplementary conditions; (5) The General <br />Conditions of the Contract for Construction; and (6) Drawings and <br />specifications <br />Note: in case of an inconsistency between drawings and specifications or within either <br />document not clarified by addendum, the better quality or greater quantity of <br />work shall be provided. <br />ARTICLE 2 <br />"Owner" <br />Add to Article 2, Owner, the following: <br />2.2.6 Communication between the Owner and the Contractor shall be by the <br />Contractor's superintendant through the Architect/Engineer's representative. <br />2.5 OWNERS REPRESENTATION <br />2.5.1 Owner represents to the Contractor that the roof deck, walls or other structures <br />extending above the roof deck, which will be utilized to secure the roof system, <br />are in sound, weight-bearing condition, sufficient for the purposes of the work <br />unless noted in specific areas on the Roof Plan. (See Specification Section 01 11 <br />00, Section III, Deck Repair/Replacement, paragraph B.) <br />City of Lino Lakes <br />Lino Lakes Fire Station #1 <br />RSI Project # 15-12120-02 <br />Supplementary Conditions of the Contract <br />00 73 00-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.