My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01-25-2016 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2016
>
01-25-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2016 1:39:20 PM
Creation date
2/23/2016 3:48:13 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
01/25/2016
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 01 11 00 <br />SUMMARY OF WORK <br />This Section is for the convenience of the Contractor only and should not be construed as a <br />complete accounting of all work to be performed. <br />The extent of the scope of work is indicated on the drawings and by the requirements of each <br />Section. A copy of this Project Manual, Specifications and Detail Drawings (including all <br />addenda and change orders) is required to be available on the project site at all times. <br />PART 1 — GENERAL <br />1.01 Discovery And Verification: <br />A. It is the responsibility of the Contractor to visit the project site to verify <br />dimensions and construction of all existing details, equipment, and job site <br />conditions pertaining to this work prior to bidding. <br />B. The details shown and descriptions of existing assemblies were obtained via <br />isolated and random reviews by Roof Spec, Inc. and/or from the original <br />drawings. <br />C. Materials and conditions shown by the details should not be construed as <br />representative of each detail item on the entire roof area. <br />1.02 Demolition And Roof Preparation: <br />A. Prior to removal of existing roof system, provide all necessary protection for <br />Owner's equipment and personnel. <br />B. Remove debris and loose gravel (if present) from roof area and properly dispose <br />of all materials off-site. <br />C. Tear off existing roof membrane, base flashings, insulation material and loose <br />vapor retarder (if present) down to the roof deck and properly dispose of off-site. <br />D. Ensure that all drains are in proper working order and that drain lines are clear to <br />the first elbow. <br />PART 2 — NOT USED <br />City of Lino Lakes <br />Lino Lakes Fire Station #1 <br />RSI Project #15-12120-02 <br />Summary of Work <br />01 11 00-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.