Section 01 11 00 <br />SUMMARY OF WORK <br />This Section is for the convenience of the Contractor only and should not be construed as a <br />complete accounting of all work to be performed. <br />The extent of the scope of work is indicated on the drawings and by the requirements of each <br />Section. A copy of this Project Manual, Specifications and Detail Drawings (including all <br />addenda and change orders) is required to be available on the project site at all times. <br />PART 1 — GENERAL <br />1.01 Discovery And Verification: <br />A. It is the responsibility of the Contractor to visit the project site to verify <br />dimensions and construction of all existing details, equipment, and job site <br />conditions pertaining to this work prior to bidding. <br />B. The details shown and descriptions of existing assemblies were obtained via <br />isolated and random reviews by Roof Spec, Inc. and/or from the original <br />drawings. <br />C. Materials and conditions shown by the details should not be construed as <br />representative of each detail item on the entire roof area. <br />1.02 Demolition And Roof Preparation: <br />A. Prior to removal of existing roof system, provide all necessary protection for <br />Owner's equipment and personnel. <br />B. Remove debris and loose gravel (if present) from roof area and properly dispose <br />of all materials off-site. <br />C. Tear off existing roof membrane, base flashings, insulation material and loose <br />vapor retarder (if present) down to the roof deck and properly dispose of off-site. <br />D. Ensure that all drains are in proper working order and that drain lines are clear to <br />the first elbow. <br />PART 2 — NOT USED <br />City of Lino Lakes <br />Lino Lakes Fire Station #1 <br />RSI Project #15-12120-02 <br />Summary of Work <br />01 11 00-1 <br />