My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01-25-2016 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2016
>
01-25-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2016 1:39:20 PM
Creation date
2/23/2016 3:48:13 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
01/25/2016
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 01 32 26 <br />CONSTRUCTION PROGRESS REPORTING <br />PART 1 - GENERAL <br />1.01 Description: <br />A. To provide a continuous record of the progress of the work, each Contractor shall <br />keep a daily progress report. <br />B. Format of progress reports shall be approved by Architect/Engineer at the pre - <br />construction meeting. <br />1.02 Quality Assurance: <br />A. Progress reports are to be filled out on a daily basis by the Contractor's job site <br />representative, who shall be in a supervisory position. <br />B. Wherever possible, reports shall be completed by the same individual throughout <br />the duration of the project. <br />1.03 The Architect/Engineer Shall Receive One (1) Copy of All Progress Reports on a <br />Weekly Basis. <br />PART 2 - NOT USED <br />PART 3 - EXECUTION <br />3.01 Completion of Progress Report: <br />A. Contractor shall complete one (1) form for each working day. <br />B. Forms shall also be completed for the following days: <br />1. Work days canceled or shortened due to weather, material shortages, or <br />labor conditions. <br />2. Holidays. <br />3.02 Forms Shall Be Legibly Filled out in Ink and All Pertinent Items Completed. <br />- END OF SECTION - <br />City of Lino Lakes <br />Lino Lakes Fire Station #1 <br />RSI Project #15-12120-02 <br />Construction Progress Reporting <br />01 32 26-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.