My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01-25-2016 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2016
>
01-25-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2016 1:39:20 PM
Creation date
2/23/2016 3:48:13 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
01/25/2016
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 2 - PRODUCTS <br />2.01 Shop Drawings and Coordination Drawings: <br />A. Scale and Measurements: <br />1. Make all shop drawings accurate to a scale sufficiently large to show all <br />pertinent aspects of the item. <br />B. Type of Prints Required: <br />1. Submit all shop drawings in the form of four (4) black line prints of each <br />sheet to the Architect/Engineer. <br />C. Review of Shop Drawings: <br />1. Distribution of reviewed shop drawings for the Contractors use will be by <br />the Architect/Engineer. All review comments by the Architect/Engineer <br />will be shown on the original submittal when it is returned to the <br />Contractor. The Architect/Engineer shall make and distribute all copies <br />required. <br />2.02 Manufacturer's Literature: <br />A. General: <br />1. Where contents of submitted literature from manufacturers includes data <br />not pertinent to the submittal, clearly indicate which portion of the <br />contents is being submitted for review. <br />B. Number of copies required: <br />1. Submit a minimum of four (4) copies, two (2) of which will be retained by <br />the Architect/Engineer. <br />2.03 Samples: <br />A. Accuracy of Samples: <br />1. Samples shall be of the precise article proposed to be furnished. <br />B. Number of Samples Required: <br />1. Unless otherwise specified, submit two samples. <br />2.04 Colors: <br />A. Unless the precise color is specifically described in the contract documents, and <br />whenever a choice of color is available in a specified product, submit accurate <br />color charts to the Architect/Engineer for review and selection. <br />Submittal Procedures <br />01 33 00-2 <br />City of Lino Lakes <br />Lino Lakes Fire Station #1 <br />RSI Project #15-12120-02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.