My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01-25-2016 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2016
>
01-25-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2016 1:39:20 PM
Creation date
2/23/2016 3:48:13 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
01/25/2016
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.05 Substitutions: <br />A. Approval Required: <br />1. All products proposed for use, including those specified by required <br />attributes and performance, shall require approval by the <br />Architect/Engineer before being incorporated into the work. <br />2. Do not substitute materials, equipment, or methods unless such <br />substitution has been specifically approved in writing for this work by the <br />Architect/Engineer. <br />B. "Or Equal": <br />1. Where the phrase "or equal" or "or equal as approved by the <br />Architect/Engineer" occurs in the contract documents, do not assume <br />materials, equipment, or methods will be approved as equal unless the <br />item has been specifically approved for this work by the <br />Architect/Engineer. <br />2. The decision of the Architect/Engineer shall be final. <br />PART 3 - EXECUTION <br />3.01 Timing of Submittals: <br />A. Make all submittals far enough in advance of scheduled dates for installation to <br />provide all time required for reviews, securing necessary approvals, possible <br />revisions and re -submittals, and placing orders and securing delivery. <br />B. Submittal Review Time: <br />1. In scheduling, allow at least ten (10) calendar days for review by the <br />Architect/Engineer following the Architect/Engineer's receipt of the <br />submittal. <br />C. Delays: <br />1. Delays caused by tardiness in receipt of submittals will not be an <br />acceptable basis for extension of the contract completion date. <br />D. Architect's/Engineer's Review: <br />1. Review by the Architect/Engineer shall not be construed as a complete <br />check, but only that the general method of construction and detailing is <br />satisfactory. Review shall not relieve the Contractor from responsibility <br />for errors which may exist. <br />E. Authority to Proceed: <br />1. The notations "reviewed, no exceptions noted" or "reviewed, exceptions <br />noted" authorize the Contractor to proceed with fabrication, purchase, or <br />both, of the items so noted, subject to the revisions, if any, required by the <br />Architect's/Engineer's review comments. <br />City of Lino Lakes <br />Lino Lakes Fire Station #1 <br />RSI Project #15-12120-02 <br />Submittal Procedures <br />01 33 00-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.