Laserfiche WebLink
PART 2 - PRODUCTS <br />2.01 Utilities: <br />A. General: All temporary facilities shall be subject to the Owner's approval. <br />1. Electricity: <br />a. The Owner may furnish electricity at the site. Special electrical <br />requirements must be reviewed and approved by the Owner. <br />b. Contractor's access to electricity is to be from supply designated <br />by Owner. <br />c. Furnish and install necessary temporary wiring, and upon <br />completion of the work, remove all such temporary facilities. <br />2. Water: <br />a. Owner will furnish water needed for construction at no cost to <br />Contractor. <br />b. Contractor to provide all hoses, etc. <br />c. Contractor to provide drinking water. <br />2.02 Contractor's Facilities: <br />A. Provide temporary sanitary facilities in the quantity required for use of all <br />personnel. Maintain in a sanitary condition at all times. <br />2.03 Enclosures: <br />A. Furnish, install, and maintain for the duration of construction, all required <br />scaffolds, tarpaulins, barricades, canopies, warning signs, steps, bridges, <br />platforms, and other temporary construction necessary for proper completion of <br />the work in compliance with all safety and other regulations. <br />2.04 Project Signs: <br />A. Allow no signs or advertising of any kind on the job site. <br />PART 3 - EXECUTION <br />3.01 Maintenance and Removal: <br />A. Maintain all temporary facilities and controls as long as needed for the safe and <br />proper completion of the work. <br />B. Remove all such temporary facilities and controls as rapidly as progress of the <br />work will permit, or as directed by the Architect/Engineer. <br />- END OF SECTION - <br />Temporary Facilities and Controls <br />01 50 00-2 <br />City of Lino Lakes <br />Lino Lakes Fire Station #1 <br />RSI Project #15-12120-02 <br />