My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01-25-2016 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2016
>
01-25-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2016 1:39:20 PM
Creation date
2/23/2016 3:48:13 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
01/25/2016
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.05 Submittals: <br />A. General: Comply with the provisions of Section 01 33 00 Submittal Procedures <br />and 01 32 16 Construction Progress Schedules. <br />B. Product Data: Within ten (10) calendar days after award of contract, submit: <br />1. Complete material list of all items proposed to be furnished and installed <br />under this section. <br />2. Manufacturer's specifications and other data required to demonstrate <br />compliance with specified requirements. <br />3. Manufacturer's recommended methods of installation. <br />4. When approved by the Architect/Engineer, the manufacturer's <br />recommended methods of installation (unless superseded by the <br />specifications) will become the basis for accepting or rejecting the actual <br />installation. <br />1.06 Product Handling: <br />A. Delivery and storage: Deliver materials to the job site in original, unopened <br />containers no sooner than five (5) calendar days prior to start of job. Materials to <br />be stored up, off of the roof deck or ground, and covered with a weatherproof <br />covering anchored sufficiently so as to resist wind blow -off. Only those materials <br />necessary to accomplish two days' work are to be stored on the roof. <br />1. Contractor is responsible for all materials delivered to job site until <br />completion of project. <br />2. When storing materials on the roof, do not over -stress deck. <br />B. Protection: Use all means necessary to protect the materials of this section before, <br />during, and after installation and to protect the work and materials of all other <br />trades. <br />C. Replacements: In the event of damage, immediately make all repairs and <br />replacements to the approval of the Architect/Engineer and at no additional cost to <br />the Owner. <br />1.07 Product Handling: <br />A. Work is to be performed on a daily basis, with each section completed before <br />progressing to the next days work. <br />B. Completion of work shall be defined as the installation of all specified substrate <br />preparation, vapor retarder (if required), insulation and membrane completely <br />sealed at perimeters, curbs and penetrations. <br />Roof Board Insulation <br />07 22 16-2 <br />City of Lino Lakes <br />Lino Lakes Fire Station #1 <br />RSI Project #15-12120-02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.