Laserfiche WebLink
Section 07 53 23 <br />FULLY ADHERED EPDM ROOFING <br />PART 1 - GENERAL <br />1.01 Description: <br />A. Furnish and install a weather and watertight fully adhered EPDM roof complete, <br />in place, as shown on the drawings and specified herein, for a complete and <br />proper installation including, but not necessarily limited to: <br />1. The complete removal of existing membrane including base flashing, <br />metal flashings, counterflashings and all other items necessary for a <br />complete waterproof installation. <br />2. Contractor shall take all necessary precautions to protect Owner's property <br />from damage caused by weather conditions, excessive loading of the <br />existing structural system or careless workmanship. <br />3. Metal cap flashings, counterflashings, and miscellaneous sheet metal work <br />incorporated into the work shall be installed and made watertight as a part <br />of the work of this section. <br />4. Installation of wood nailers, wood edge strips and plywood backers in <br />accordance with manufacturer's specifications and/or as shown on <br />drawings. Contractor shall coordinate the installation of all carpentry <br />work required for the membrane system herein specified. <br />1.02 Quality Assurance: <br />A. Standards: Comply with standards specified in this section and as listed in the <br />general requirements. <br />B. Qualifications of manufacturer: Products used in the work included in this section <br />shall be produced by manufacturers regularly engaged in the manufacture of <br />similar items and with a history of successful production acceptable to the <br />Architect/Engineer. <br />C. Qualifications of Contractor: The Contractor and contract personnel shall be <br />currently approved by the manufacturer as qualified to install the materials of this <br />section. <br />D. Qualifications of Installers: Use an adequate number of skilled installers who are <br />thoroughly trained and experienced in the necessary crafts and who are <br />completely familiar with the requirements and the methods needed for proper <br />performance of the work in this section. <br />E. Roofing Inspections: Make all required notifications and secure all required <br />inspections by the manufacturer of the approved materials to facilitate issuance of <br />the specified roof warranty. <br />City of Lino Lakes <br />Lino Lakes Fire Station #1 <br />RSI Project # 15-12120-02 <br />Fully Adhered EPDM Roofing <br />07 53 23-1 <br />