My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01-25-2016 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2016
>
01-25-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2016 1:39:20 PM
Creation date
2/23/2016 3:48:13 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
01/25/2016
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.03 Related Work: <br />A. Section 07 22 16 Roof Board Insulation <br />1.04 References: <br />A. Materials used in this section shall be listed in the latest editions of the following: <br />1. Factory Mutual Approval Guide. <br />2. Underwriters Laboratories, Inc. - building materials directory. <br />3. The NRCA Roofing and Waterproofing Manual, 5t' Edition — National <br />Roofing Contractors Association <br />4. The Wind Design Guide for Fully Adhered Single Ply Roof Systems by <br />SPRI (Single Ply Roofing Institute). <br />1.05 Submittals: <br />A. General: Comply with the provisions of Section 01 33 00 Submittal Procedures <br />and 01 32 16 Construction Progress Schedules. <br />B. Product Data: Within ten (10) calendar days after award of contract, submit: <br />1. Complete material list of all items proposed to be furnished and installed <br />under this section. <br />2. Manufacturer's specifications and other data required to demonstrate <br />compliance with specified requirements. <br />3. Manufacturers recommended methods of installation. <br />4. When approved by the Architect/Engineer, the manufacturer's <br />recommended methods of installation (unless superseded by the <br />specifications) will become the basis for accepting or rejecting the actual <br />installation. <br />1.06 Product Handling: <br />A. Delivery and Storage: <br />1. Coordinate storage of materials with Owner and Architect/Engineer. <br />2. Deliver all packaged materials to the job site in their original unopened <br />containers with all labels intact and legible. <br />3. Store all materials in an approved manner, up off of the roof deck or <br />ground, and protected from exposure to the elements. <br />4. Store all rolls of felts, cartons and drums of cements, primers and coating <br />on end. <br />B. Protection: <br />1. Use all necessary means to protect the materials in this section before, <br />during, and after installation, and to protect the work and materials of all <br />other trades. <br />C. Replacements: <br />1. In the event of damage, immediately make all repairs and replacements <br />Fully Adhered EPDM Roofing <br />07 53 23-2 <br />City of Lino Lakes <br />Lino Lakes Fire Station #1 <br />RSI Project # 15-12120-02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.