Laserfiche WebLink
1.03 Related Work: <br />A. Section 07 22 16 Roof Board Insulation <br />1.04 References: <br />A. Materials used in this section shall be listed in the latest editions of the following: <br />1. Factory Mutual Approval Guide. <br />2. Underwriters Laboratories, Inc. - building materials directory. <br />3. The NRCA Roofing and Waterproofing Manual, 5t' Edition — National <br />Roofing Contractors Association <br />4. The Wind Design Guide for Fully Adhered Single Ply Roof Systems by <br />SPRI (Single Ply Roofing Institute). <br />1.05 Submittals: <br />A. General: Comply with the provisions of Section 01 33 00 Submittal Procedures <br />and 01 32 16 Construction Progress Schedules. <br />B. Product Data: Within ten (10) calendar days after award of contract, submit: <br />1. Complete material list of all items proposed to be furnished and installed <br />under this section. <br />2. Manufacturer's specifications and other data required to demonstrate <br />compliance with specified requirements. <br />3. Manufacturers recommended methods of installation. <br />4. When approved by the Architect/Engineer, the manufacturer's <br />recommended methods of installation (unless superseded by the <br />specifications) will become the basis for accepting or rejecting the actual <br />installation. <br />1.06 Product Handling: <br />A. Delivery and Storage: <br />1. Coordinate storage of materials with Owner and Architect/Engineer. <br />2. Deliver all packaged materials to the job site in their original unopened <br />containers with all labels intact and legible. <br />3. Store all materials in an approved manner, up off of the roof deck or <br />ground, and protected from exposure to the elements. <br />4. Store all rolls of felts, cartons and drums of cements, primers and coating <br />on end. <br />B. Protection: <br />1. Use all necessary means to protect the materials in this section before, <br />during, and after installation, and to protect the work and materials of all <br />other trades. <br />C. Replacements: <br />1. In the event of damage, immediately make all repairs and replacements <br />Fully Adhered EPDM Roofing <br />07 53 23-2 <br />City of Lino Lakes <br />Lino Lakes Fire Station #1 <br />RSI Project # 15-12120-02 <br />