My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01-25-2016 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2016
>
01-25-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2016 1:39:20 PM
Creation date
2/23/2016 3:48:13 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
01/25/2016
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Caulking sealant for exposed joints shall be a one -component polyurethane <br />sealant conforming to Federal Specification TT -S -00230C(2), Type II, Class A or <br />B. <br />1. Approved Products: <br />a. Tremco Vulkem 116 <br />b. Sika Sikaflex la <br />c. Sonneborn Sonalastic Npl <br />d. Approved Equal <br />PART 3 - EXECUTION <br />3.01 General: <br />A. The latest manufacturer specifications and installation techniques are to be <br />followed. <br />3.02 Inspection: <br />A. Examine the areas and conditions under which work in this section will be <br />installed. Correct conditions detrimental to the proper and timely completion of <br />the work. Do not proceed until such conditions have been corrected. <br />3.03 Job Conditions: <br />A. Protection: <br />1. Existing work shall be properly protected from damage or soiling during <br />the process of removal of existing roofing and installation of new roofing <br />material. Exercise special care at openings through roof and at roof edges. <br />Spill no roofing materials on building surfaces. Any finished work <br />damaged in the execution of work of this section, including <br />lawns/shrubbery, shall be replaced or restored to the original condition by <br />this Contractor. <br />2. Contractor shall protect existing roofing with minimum 3/4 inch thick <br />plywood protection board. Any damage to existing roof shall be repaired <br />by Contractor. <br />B. Workmanship: <br />1. Flashing and sheet metal work shall be accomplished to fulfill the <br />requirements of the drawings and specifications. Any specific directions <br />furnished by the manufacturer regarding the application of their materials <br />shall be strictly followed. <br />Flashing and Sheet Metal <br />07 62 00-6 <br />City of Lino Lakes <br />Lino Lakes Fire Station #1 <br />RSI Project # 15-12120-02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.