My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01-25-2016 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2016
>
01-25-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2016 1:39:20 PM
Creation date
2/23/2016 3:48:13 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
01/25/2016
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.10 Other Materials: <br />A. All other Materials such as fasteners and retainers, not specifically described but <br />required for a complete and proper installation of building insulation, shall be as <br />selected by the Contractor subject to the approval of the Engineer. <br />PART 3 - EXECUTION <br />3.01 Examination: <br />A. Verification of Conditions: <br />1. Examine walls, floors, roof, and plumbing chases for suitable conditions <br />where piping and specialties are to be installed. <br />2. Do not proceed until unsatisfactory conditions have been corrected. <br />B. Before submitting his bid, this Contractor shall visit the building site and become <br />familiar with all existing conditions that affect his work. Some material or work <br />may be required to complete the project that can only be determined by visiting <br />the site. <br />C. No extras will be allowed because of the Contractor's misunderstanding as to the <br />amount of work involved or his lack of knowledge of any site conditions which <br />may affect his work. Any apparent variance of the plans or specifications from <br />the existing conditions at the site shall be called to the attention of the Engineer <br />prior to submittal of a bid. <br />3.02 Temporary Protection: <br />A. Provide temporary bracing, shoring, and support for the execution of the work and <br />the protection of persons and property during demolition. Perform all work with <br />appropriate supports, protection, and methods to prevent collapse, settling, or <br />damage to property or persons. Provide adequate supports for the loads to be <br />carried, properly distributed, to lower levels or to sound bearing, if necessary. <br />B. Provide all protective coverings and enclosures necessary to prevent damage to <br />existing spaces and materials which are to remain. Protect openings in exterior <br />walls and roofs to prevent damage from water and weather and to prevent <br />excessive heat loss from the existing buildings. Maintain a watertight installation <br />by scheduling the work and removals at the exterior according to weather <br />conditions. <br />City of Lino Lakes <br />Lino Lakes Fire Station #1 <br />RSI Project # 15-12120-02 <br />Plumbing (Roofing Related) <br />22 14 26-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.