Laserfiche WebLink
B. The Contract Documents are diagrammatic and are a graphic representation of <br />requirements intended to convey the scope of work and to indicate the fixtures <br />and other included work. Pipe rerouting and size changes are to be added at no <br />additional cost to the Owner. <br />C. Locations of items not definitely fixed by dimensions are approximate only and <br />exact locations necessary to secure the best conditions and results shall be <br />determined at the site and be subject to review. <br />D. Follow Contract Documents in laying out work, check work or other trades to <br />verify spaces in which work will be installed and maintain maximum headroom <br />and space conditions at all points. <br />E. Where pipes are in partitions, furred out spaces and chases, obtain information as <br />to their exact location and size and install work so as to be entirely concealed in <br />the allotted space. If conflicts arise making this impossible, obtain instructions <br />from the Engineer before proceeding with the work. <br />F. Wherever two or more pipes are to be installed in parallel, or parallel to the piping <br />of other trades, the piping shall be installed with sufficient space between pipes to <br />allow for the proper application of pipe covering, painting and servicing. <br />G. Where there is evidence that parts of the work will interfere with other work <br />and/or the structure, assist in working out space conditions and make necessary <br />adjustments to accommodate the work. <br />H. Work installed before coordinating with other trades which causes interference <br />with other work shall be changed to correct such condition without additional cost <br />to Owner. This shall apply to shop fabricated work as well as work fabricated in <br />place. <br />I. Products, appliances and equipment are to be installed and connected using <br />standard industry practices and in accordance with the manufacturer's <br />instructions. <br />3.06 General Methods For Piping Installation: <br />A. Pipes shall be round and straight. Cutting shall be done with proper tools and <br />pipes shall be reamed to full size after cutting. <br />B. Piping shall be properly enclosed, supported, guided, anchored, sway braced, <br />connected, tested, cleaned and flushed out and shall be properly insulated and <br />protected where required. <br />City of Lino Lakes <br />Lino Lakes Fire Station #1 <br />RSI Project # 15-12120-02 <br />Plumbing (Roofing Related) <br />22 14 26-9 <br />