Laserfiche WebLink
B. Provide a minimum of 1" thick insulation on all rainwater leader piping and roof <br />drain bowls. <br />3.12 Field Quality Control: <br />A. Finished roof drainage system shall not be put into use until inspected and <br />approved by authority having jurisdiction. <br />B. Notify plumbing official at least 24 hours prior to the time such inspection must <br />be made. Perform required testing in the presence of the plumbing official. <br />C. Repair leaks and defects using new materials and retest system or portion thereof <br />until satisfactory results are obtained. <br />D. Contractors shall perform all tests required by referenced standards, code <br />authorities, or otherwise specified and shall assume responsibility for all charges <br />and expenses. Certification of test results shall be submitted to the Engineer and <br />Owner. <br />3.13 Protection and Cleaning: <br />A. Clean dirt and debris from inside of pipes and drains as work progresses. <br />B. Place plugs in ends of uncompleted piping at the end of each day's work. <br />C. Temporarily protect drains. Sections of insulation board may be cut to fit into <br />drain base to keep debris from falling into drain leaders. Remove temporary <br />protection prior to precipitation. <br />- END OF SECTION - <br />Plumbing (Roofing Related) <br />22 14 26-14 <br />City of Lino Lakes <br />Lino Lakes Fire Station #1 <br />RSI Project # 15-12120-02 <br />