My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01-25-2016 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2016
>
01-25-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2016 1:39:20 PM
Creation date
2/23/2016 3:48:13 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
01/25/2016
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Provide a minimum of 1" thick insulation on all rainwater leader piping and roof <br />drain bowls. <br />3.12 Field Quality Control: <br />A. Finished roof drainage system shall not be put into use until inspected and <br />approved by authority having jurisdiction. <br />B. Notify plumbing official at least 24 hours prior to the time such inspection must <br />be made. Perform required testing in the presence of the plumbing official. <br />C. Repair leaks and defects using new materials and retest system or portion thereof <br />until satisfactory results are obtained. <br />D. Contractors shall perform all tests required by referenced standards, code <br />authorities, or otherwise specified and shall assume responsibility for all charges <br />and expenses. Certification of test results shall be submitted to the Engineer and <br />Owner. <br />3.13 Protection and Cleaning: <br />A. Clean dirt and debris from inside of pipes and drains as work progresses. <br />B. Place plugs in ends of uncompleted piping at the end of each day's work. <br />C. Temporarily protect drains. Sections of insulation board may be cut to fit into <br />drain base to keep debris from falling into drain leaders. Remove temporary <br />protection prior to precipitation. <br />- END OF SECTION - <br />Plumbing (Roofing Related) <br />22 14 26-14 <br />City of Lino Lakes <br />Lino Lakes Fire Station #1 <br />RSI Project # 15-12120-02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.