My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01-25-2016 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2016
>
01-25-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2016 1:39:20 PM
Creation date
2/23/2016 3:48:13 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
01/25/2016
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 23 01 00 <br />MECHANICAL WORK <br />PART 1 - GENERAL <br />1.01 Description: <br />A. It shall be the responsibility of the roofing Contractor to retain the services of a <br />mechanical Contractor to disconnect and reconnect mechanical equipment on the <br />roofs where it becomes necessary to raise items of mechanical equipment to <br />properly flash curbs or pipes. <br />1. It shall be the responsibility of this Contractor to verify that air <br />conditioning and miscellaneous equipment is in operational condition <br />prior to his removal of same. <br />2. In the event that roof top cooling units or miscellaneous equipment have to <br />be lifted from the roof structure to accomplish the re -roofing work, <br />Contractor shall make whatever arrangements necessary to safely remove <br />these items from the roof and replace them upon completion of work. <br />3. Any items damaged by this Contractor's work shall be repaired or <br />replaced by him at no cost to the Owner. <br />B. Contractor shall include all materials and labor necessary to extend duct work, <br />piping, etc. as may be required. <br />C. Upon replacement of equipment after re -roofing work is complete, Contractor <br />shall reconnect all disrupted services to same and test equipment unit prior to <br />turning it over to Owner. <br />1.02 Related Work: <br />A. Section 07 51 13 Asphalt Built -Up Roofing <br />1.03 Scheduling: <br />A. Contractor shall co-ordinate this work with the Owner so as to keep the <br />interruption of equipment operation to a minimum. Adequate lead time shall be <br />provided. <br />1. Owner shall familiarize Contractor with location of controls, equipment, <br />etc. which affect his work. <br />PART 2 - NOT USED <br />PART 3 - NOT USED <br />- END OF SECTION - <br />City of Lino Lakes <br />Lino Lakes Fire Station #1 <br />RSI Project # 15-12120-02 <br />Mechanical Work <br />23 01 00-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.