Laserfiche WebLink
5.3.10 Baldwin RMU Subwatershed <br />Table 21. RMU Specific Actions: Baldwin RMU <br />WETLAND MANAGEMENT <br />Evaluate the potential to implement volume reduction practices in the catchments discharging to stormwater- <br />sensitive wetlands which are at risk under current conditions. <br />REGULATIONS, PERMITTING AND REPORTING - <br />Develop Subwatershed Management Plan. <br />5.3.11 Middle Rice Creek RMU Subwatershed <br />Table 22. RMU Specific Actions: Middle Rice Creek RMU <br />NATURAL RESOURCES <br />Work with MnDOT to address corridor gaps and wildlife barriers in Middle Creek RMU. <br />WETLAND MANAGEMENT <br />Wetlands at risk from stormwater should be evaluated for reducing volume effects in the catchments. <br />REGULATIONS, PERMITTING AND REPORTING <br />Develop Resource Management System Plan. <br />5.3.12 Wilkinson RMU Subwatershed <br />Table 23. RMU Specific Actions: Wilkinson RMU <br />REGULATIONS, PERMITTING AND REPORTING <br />Develop Subwatershed Management Plan. <br />5.4. Implementation Costs <br />The estimated costs for the City of Lino Lakes to implement the city-wide and RMU-specific actions <br />included in this implementation plan as defined in Section 5.1 are summarized in Table 24. These actions <br />are broken down into 3 project types; 1) Capital Improvement Projects (CIP), 2) Programs, and 3) <br />Studies. Capital Improvement Projects include but are not limited to new stormwater capacity, quality or <br />volume control improvements as well as wetland mitigation or restoration activities. Programs include <br />ongoing education, inspection, maintenance, and pollution prevention activities that are necessary to <br />maintain the existing system and meet the requirements of the City's NPDES permit. The Study category <br />includes projects necessary to evaluate the City's system including subwatershed drainage plans and <br />feasibility studies. <br />Actions in the implementation plan as defined in Sections 5.2 and 5.3 are summarized in Table 25. The <br />total estimated cost to implement this plan, including City-wide and all RMU Subwatershed Areas, is <br />$2,901,800 over 10 years, or approximately $290,180 per year. It should be noted, that some of the costs <br />should be recovered through surface water management impact fees collected in conjunction with <br />development. While there are some infrastructure costs included here, it is fairly minimal on <br />infrastructure projects. The majority of costs are related to maintenance of the existing system and <br />satisfying the programmatic requirements of the City's NPDES permit. It is further assumed that once <br />the more detailed RMU Subwatershed Plans are completed, more of the infrastructure costs will be <br />defined so it can be included in developer fees for each area. <br />City of Lino Lakes SWMP 1 December 20151 88 <br />