My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2015-093 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2015
>
2015-093 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2016 11:42:58 AM
Creation date
3/7/2016 10:22:33 AM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
09/14/2015
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WSB <br />IIMMINIk engineering planning ~ environmental • construction 701 Xenia Avenue South <br />Suite 300 <br />Minneapolis, MN 55416 <br />Tel: 763-541-4800 <br />Fax: 763-541-1700 <br />September 2, 2015 <br />Mr. Michael Grochala <br />Community Development Director <br />City of Lino Lakes <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />Re: Proposal and Scope of Work to Finalize Stormwater Plan and Complete Feasibility Study <br />for Storm Sewer Outlet for Northeast Area of Lino Lakes <br />City of Lino Lakes, MN <br />Dear Mr. Grochala: <br />The City of Lino Lakes is requesting assistance with the development of a feasibility report <br />associated with providing a new storm sewer outlet for a 1,400 acre area in northeast Lino Lakes. <br />This proposal and scope of work is prepared in response to this request. <br />As part of this effort, WSB would perform the following tasks: <br />1. Finalize/Memorialize Design Parameters for Project <br />Based on discussions with City staff, RCWD staff, their consultants and DNR, due to <br />downstream impact concerns, the stormwater plan and model for the area will need to be <br />updated to reflect the feasibility level design developed. As part of this effort, we will <br />update and memorialize the storm water plan for the area, prepare and follow up on a no - <br />rise certification submittal to DNR, and prepare other necessary submittals to the RCWD. <br />Although there are no guarantees that approvals will be granted for the project until the <br />final design is completed and permits are issues, these submittals are needed at this stage <br />to increasingly verify to a reasonable extent the project is feasible. Upon completion of <br />this task, a blueprint for the amount of live storage, dead pool storage, water reuse, or <br />infiltration to be provided when the area is fully developed will be available, along with <br />an implementation plan. <br />Schedule and Cost <br />It is anticipated this work will take six weeks to develop the reports and submittals <br />outlined above, and additional time to receive the responses from those agencies. Some <br />of this work can and should be completed concurrently with other tasks. This work can <br />be completed at an estimated cost of $16,772. <br />Equal Opportunity Employer <br />wsbeng.com <br />N': Troposalsilino Lates1.112- mgrochala - AT Area 061715.dac <br />
The URL can be used to link to this page
Your browser does not support the video tag.