Laserfiche WebLink
Project Material Status <br />Item <br />No. <br />Item <br />Description <br />Units <br />Unit Price <br />Contract <br />Quantity <br />Quantity to <br />Date <br />Current <br />Quantity <br />Amount to <br />Date <br />AREA 1 - FAIRMONT DRIVE <br />1 <br />2021.501 <br />MOBILIZATION <br />LUMP SUM <br />$1,380.00 <br />1 <br />1 0 <br />$1,380.00 <br />2 <br />2104.505 <br />REMOVE BITUMINOUS PAVEMENT <br />SQ YD <br />$7.00 <br />130 <br />293.3 0 <br />$2,053.10 <br />3 <br />2104.505 <br />REMOVE CONCRETE VALLEY GUTTER <br />SQ YD <br />$15.00 <br />10 <br />5.3 0 <br />$79.50 <br />4 <br />2104.511 <br />SAWING CONCRETE PAVEMENT (FULL DEPTH) <br />LIN FT <br />$11.00 <br />10 <br />10 0 <br />$110.00 <br />5 <br />2104.513 <br />SAWING BITUMINOUS PAVEMENT (FULL DEPTH) <br />LIN FT <br />$7.00 <br />80 <br />22 0 <br />$154.00 <br />6 <br />2451.507 <br />GRANULAR FOUNDATION AND/OR BEDDING <br />TON <br />$38.00 <br />10 <br />0 0 <br />$0.00 <br />7 <br />2503.541 <br />12" RC PIPE SEWER DESIGN 3006 CLASS V <br />LIN FT <br />$36.00 <br />110 <br />104 0 <br />$3,744.00 <br />8 <br />2503.602 <br />CONNECT TO EXISTING STORM SEWER <br />EACH <br />$2,730.00 <br />1 <br />1 0 <br />$2,730.00 <br />9 <br />2506.501 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020 <br />LIN FT <br />$585.00 <br />5 <br />4.1 0 <br />$2,398.50 <br />10 <br />2506.502 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN G <br />EACH <br />$2,140.00 <br />1 <br />1 0 <br />$2,140.00 <br />11 <br />2506.516 <br />CASTING ASSEMBLY <br />EACH <br />$465.00 <br />1 <br />1 0 <br />$465.00 <br />12 <br />2531.604 <br />7" CONCRETE VALLEY GUTTER <br />SO YD <br />$77.00 <br />10 <br />5.3 0 <br />$408.10 <br />13 <br />2550.604 <br />PATCH <br />SQ YD <br />$49.00 <br />130 <br />293.3 0 <br />$14,371.70 <br />14 <br />2563.601 <br />TRAFFIC CONTROL <br />LUMP SUM <br />$635.00 <br />1 <br />1 0 <br />$635.00 <br />15 <br />2575.501 <br />SEEDING (INCL TOPSOIL & FERTILIZER) <br />ACRE <br />$3,100.00 <br />0.02 <br />0.034 0 <br />$105.40 <br />16 <br />2575.502 <br />SEED MIXTURE 240 <br />POUND <br />$10.00 <br />3 <br />2.7 0 <br />$27.00 <br />17 <br />2575.523 <br />EROSION CONTROL BLANKETS CATEGORY 4 <br />SQ YD <br />$9.00 <br />60 <br />165.9 0 <br />$1,493.10 <br />Totals For Section AREA 1 - FAIRMONT DRIVE: <br />$32,294.40 <br />AREA 2 - SUNRISE ROAD <br />18 <br />2021.501 <br />MOBILIZATION <br />LUMP SUM <br />$1,380.00 <br />1 <br />1 <br />0 <br />$1,380.00 <br />19 <br />2104.501 <br />REMOVE BITUMINOUS CURB <br />LIN FT <br />$6.00 <br />20 <br />18 <br />0 <br />$108.00 <br />20 <br />2104.505 <br />REMOVE BITUMINOUS PAVEMENT <br />SO YD <br />$7.00 <br />150 <br />234.3 <br />0 <br />$1,640.10 <br />21 <br />2104.513 <br />SAWING BITUMINOUS PAVEMENT (FULL DEPTH) <br />LIN FT <br />$7.00 <br />220 <br />222 <br />0 <br />$1,554.00 <br />22 <br />2104.602 <br />SALVAGE AND REINSTALL MAILBOX <br />EACH <br />$100.00 <br />1 <br />3 <br />0 <br />$300.00 <br />23 <br />2451.507 <br />GRANULAR FOUNDATION AND/OR BEDDING <br />TON <br />$38.00 <br />10 <br />0 <br />0 <br />$0.00 <br />24 <br />2503.541 <br />12" RC PIPE SEWER DESIGN 3006 CLASS V <br />LIN FT <br />$36.00 <br />170 <br />162 <br />0 <br />$5,832.00 <br />25 <br />2503.602 <br />CONNECT TO EXISTING STORM SEWER <br />EACH <br />$2,730.00 <br />1 <br />1 <br />0 <br />$2,730.00 <br />26 <br />2506.501 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020 <br />LIN FT <br />$575.00 <br />6 <br />5.2 <br />0 <br />$2,990.00 <br />27 <br />2506.502 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 1 <br />EACH <br />$1,970.00 <br />1 <br />1 <br />0 <br />$1,970.00 <br />28 <br />2506.516 <br />CASTING ASSEMBLY <br />EACH <br />$465.00 <br />1 <br />1 <br />0 <br />$465.00 <br />29 <br />2535.501 <br />BITUMINOUS CURB <br />LIN FT <br />$11.00 <br />20 <br />18 <br />0 <br />$198.00 <br />30 <br />2550.604 <br />PATCH <br />SQ YD <br />$49.00 <br />150 <br />231.4 <br />0 <br />$11,338.60 <br />31 <br />2563.601 <br />TRAFFIC CONTROL <br />LUMP SUM <br />$785.00 <br />1 <br />1 <br />0 <br />$785.00 <br />32 <br />2575.501 <br />SEEDING (INCL TOPSOIL & FERTILIZER) <br />ACRE <br />$3,100.00 <br />0.03 <br />0.04 <br />0 <br />$124.00 <br />33 <br />2575.502 <br />SEED MIXTURE 240 <br />POUND <br />$10.00 <br />5 <br />3.2 <br />0 <br />$32.00 <br />34 <br />2575.523 <br />EROSION CONTROL BLANKETS CATEGORY 4 <br />SQ YD <br />$9.00 <br />130 <br />196.8 <br />0 <br />$1,771.20 <br />Totals For Section AREA 2 - SUNRISE ROAD: <br />$33,217.90 <br />AREA 3 - GLADSTONE DRIVE <br />35 <br />2021.501 <br />MOBILIZATION <br />LUMP SUM <br />$1,100.00 <br />1 <br />1 <br />0 <br />$1,100.00 <br />36 <br />2104.501 <br />REMOVE PIPE CULVERTS <br />LIN FT <br />$16.00 <br />70 <br />70 <br />0 <br />$1,120.00 <br />37 <br />2104.505 <br />REMOVE BITUMINOUS PAVEMENT <br />SQ YD <br />$8.00 <br />40 <br />27.5 <br />0 <br />$220.00 <br />38 <br />2104.513 <br />SAWING BITUMINOUS PAVEMENT (FULL DEPTH) <br />LIN FT <br />$7.00 <br />70 <br />62 <br />0 <br />$434.00 <br />39 <br />2105.601 <br />SITE GRADING <br />LUMP SUM <br />$2,975.00 <br />1 <br />1 <br />0 <br />$2,975.00 <br />40 <br />2451.507 <br />GRANULAR FOUNDATION AND/OR BEDDING <br />TON <br />$38.00 <br />10 <br />0 <br />0 <br />$0.00 <br />41 <br />2501.511 <br />12" CM PIPE CULVERT <br />LIN FT <br />$33.00 <br />80 <br />82 <br />0 <br />$2,706.00 <br />42 <br />2501.515 <br />12" CM PIPE APRON <br />EACH <br />$710.00 <br />4 <br />4 <br />0 <br />$2,840.00 <br />43 <br />2550.604 <br />PATCH <br />SQ YD <br />$71.00 <br />40 <br />27.5 <br />0 <br />$1,952.50 <br />44 <br />2563.601 <br />TRAFFIC CONTROL <br />LUMP SUM <br />$700.00 <br />1 <br />1 <br />0 <br />$700.00 <br />45 <br />2575.501 <br />SEEDING (INCL TOPSOIL & FERTILIZER) <br />ACRE <br />$3,100.00 <br />0.03 <br />0.09 <br />0 <br />$279.00 <br />46 <br />2575.502 <br />SEED MIXTURE 240 <br />POUND <br />$10.00 <br />5 <br />7.2 <br />0 <br />$72.00 <br />