Laserfiche WebLink
Item <br />No. <br />Item <br />Description <br />Units <br />Unit Price <br />Contract <br />Quantity <br />Quantity <br />to Date <br />Current <br />Quantity <br />Amount to <br />Date <br />47 <br />2575.523 <br />EROSION CONTROL BLANKETS CATEGORY 4 <br />SQ YD <br />$9.00 <br />150 <br />433.9 <br />0 <br />$3,905,10 <br />Totals For Section AREA 3 GLADSTONE DRIVE: <br />$18,303.60 <br />Change Order 1 <br />48 <br />2021.501 <br />MOBILIZATION <br />LUMP SUM <br />$2,000.00 <br />1 <br />1 <br />0 <br />$2,000.00 <br />49 <br />2104.501 <br />REMOVE METAL CULVERT <br />LIN FT <br />$16.00 <br />80 <br />82 <br />0 <br />$1,312.00 <br />50 <br />2104.505 <br />REMOVE BITUMINOUS PAVEMENT <br />SQ YD <br />$8.00 <br />60 <br />93.1 <br />12.5 <br />$744.80 <br />51 <br />2105.501 <br />COMMON EXCAVATION <br />CU YD <br />$16.00 <br />350 <br />350 <br />0 <br />$5,600.00 <br />52 <br />2360.505 <br />BITUMINOUS PATCHING <br />SQ YD <br />$71.00 <br />60 <br />93.1 <br />12.5 <br />$6,610.10 <br />53 <br />2501.511 <br />12" CM PIPE CULVERT <br />LIN FT <br />$33.00 <br />50 <br />103.36 <br />0 <br />$3,410.88 <br />54 <br />2501.515 <br />12" CM PIPE APRON <br />EACH <br />$710.00 <br />2 <br />4.66 <br />0 <br />$3,308.60 <br />55 <br />2501.602 <br />TRASH GUARD FOR 12" PIPE APRON <br />EACH <br />$175.00 <br />2 <br />0 <br />0 <br />$0.00 <br />56 <br />2575.523 <br />EROSION CONTROL BLANKETS CATEGORY 3 <br />SQ YD <br />$4.30 <br />1450 <br />1236.1 <br />0 <br />$5,315.23 <br />57 <br />2575.604 <br />SEEDING, MIX 260 (INCL TOPSOIL, FERT, MULCH, DISC ANCHOR) <br />ACRE <br />$2,250.00 <br />0.3 <br />0.26 <br />0 <br />$585.00 <br />58 <br />2021.501 <br />MOBILIZATION <br />LUMP SUM <br />$2,000.00 <br />1 <br />0 <br />0 <br />$0.00 <br />59 <br />2104.501 <br />REMOVE METAL CULVERT <br />LIN FT <br />$16.00 <br />30 <br />0 <br />0 <br />$0.00 <br />60 <br />2105.501 <br />COMMON EXCAVATION <br />CU YD <br />$16.00 <br />300 <br />0 <br />0 <br />$0.00 <br />61 <br />2575.523 <br />EROSION CONTROL BLANKETS CATEGORY 3 <br />SQ YD <br />$4.30 <br />1350 <br />0 <br />0 <br />$0.00 <br />62 <br />2575.604 <br />SEEDING, MIX 260 (INCL TOPSOIL, FERT, MULCH, DISC ANCHOR) <br />ACRE <br />$2,250.00 <br />0.3 <br />0 <br />0 <br />$0.00 <br />Totals For Change Order 1: <br />$28,886.61 <br />Project Totals: <br />$112,702.51 <br />