My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05-04-2009 Council Minutes (2)
LinoLakes
>
City Council
>
City Council Meeting Minutes
>
2009
>
05-04-2009 Council Minutes (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2014 10:52:45 AM
Creation date
3/11/2013 11:31:57 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Minutes
Meeting Date
05/04/2009
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY COUNCIL WORK SESSION May 4, 2009 <br /> APPROVED <br /> 1 CITY OF LINO LAKES <br /> 2 WORK SESSION MINUTES <br /> 3 <br /> 4 DATE : May 4, 2009 <br /> 5 TIME STARTED : 6:10 p.m. <br /> 6 TIME ENDED : 9:25 p.m. <br /> 7 MEMBERS PRESENT : Council Members O'Donnell, Reinert, <br /> 8 Gallup. Stoltz and Mayor Bergeson <br /> 9 MEMBERS ABSENT : none <br /> 10 <br /> 11 <br /> 12 Staff members present: Director of Finance, Al Rolek; Director of Community <br /> 13 Development, Michael Grochala; City Engineer, Jim Studenski; Director of Public <br /> 14 Safety, Dave Pecchia; City Clerk, Julie Bartell <br /> 15 <br /> 16 A Special Council Meeting to discuss a personnel matter and possible litigation was held <br /> 17 immediately prior to the work session. <br /> 18 <br /> 19 At the regularly scheduled work session the following items were discussed. <br /> 20 <br /> 21 Pine Street Petition - City Engineer Studenski reported on a petition that the city has <br /> 22 received from residents of Pine Street, a gravel road that is shared between the City of <br /> 23 Columbus and the City of Lino Lakes. The petition requests that the city research the cost <br /> 24 of paving the roadway and is signed by 69 percent of the property owners on the Lino <br /> 25 Lakes side of the street. Mr. Studenski recalled that a petition was received from Pine <br /> 26 Street residents in 2005 after which the city sent a letter to residents requesting further <br /> 27 input; the response was varied and 41% of the residents didn't respond at all. Although a <br /> 28 project did not proceed out of that effort, the City of Columbus did do an estimate that <br /> 29 year on the cost of a project with no curb or gutter or utilities. The estimate was <br /> 30 $471,300 but a project now would no doubt be more due to inflation of costs. Mr. <br /> 31 Studenski reported that he is not aware that a petition has been submitted to the City of <br /> 32 Columbus at this time but he is keeping that city aware of this matter. <br /> 33 <br /> 34 The council discussed the City Charter public improvement process as it would relate to <br /> 35 this type of project. The project could be brought to referendum for city wide <br /> 36 participation. The process for consideration is preparation of a feasibility study, <br /> 37 notification of property owners, public hearing, 60-day waiting period to allow for a <br /> 38 petition of property owners against the project, and then, if still on track, a full assessment <br /> 39 project can proceed and if city wide contribution is included, it goes to the ballot. <br /> 40 <br /> 41 A council member noted that the cost of preparing a feasibility study has been an issue in <br /> 42 the past—if the project doesn't go forward, that cost is left hanging. Is there a way to <br /> 43 save on that cost by using information already in place from the 2005 petition? <br /> 44 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.