Laserfiche WebLink
19 <br />12. The Applicant will be extending municipal sewer and water to the westerly property (PID# <br />34.029,21.44.0004), providing benefit to the City. <br />Based on the foregoing, the Applicants' application for Preliminary and Final Plat and PUD Plans, <br />subject to tile following conditions of approval- <br />1. The Applicant shall address all of the comments outlined in the City Engineer memorandum <br />dated May 31, 2017. <br />2. The Final Plat shall not be recorded until final construction plan approval is granted and all <br />easements as requested by the City Engineer and Public Works department are recorded on <br />the Final Plat. <br />3. The Applicant shall obtain all necessary permits including but not limited to all applicable <br />city permits (building, grading, sign, etc.), NPDES/SWPPP permits, and Valley Branch <br />Watershed District approval. <br />4. The Applicant should review with the MPCA if infiltration practices will be allowed, in <br />particular the planned conversion of the existing storm water pond to a storm water <br />infiltration basin directly east and adjacent to the service station, <br />5. The Applicant shal I address all comments outlined in the Minnesota Department of <br />Transportation memorandum dated June 1, 2017. <br />6. The Applicant shall be required to extend sanitary sewer and municipal water service to the <br />westerly adjacent property. <br />7. Stormwater facilities shall be privately owned and maintained. A Stormwater Maintenance <br />and Easement Agreement in the City's standard form must be executed and recorded. <br />8. A right turn lane on Hudson Boulevard shall be constructed at the Applicant to handle <br />increased traffic volumes. <br />9. The Applicant shall amend the proposed Landscape Plan to comply with City standards and <br />obtain approval by the City. <br />10. The Applicant shall provide financial security for 125% of landscaping materials with a Site <br />Work Agreement. <br />11. The Applicant shall provide further information on the proposed drive -through locations <br />including but not I imited to exact location of speakers, windows, and refuse receptacles as <br />well as drive -through canopy detail. <br />12. The Applicant shall address all of the recommendations to improve the drive -through <br />operations as outlined in the Technical Memorandum prepared by Spack Consulting dated <br />April 12,2017. <br />13. The Applicant shall submit a photometric plan, and all lighting must meet requirements of <br />Sections 150.035-150.038 of the City Code. <br />14. The Applicant shall pay a park dedication fee of $4500 per acre, totaling $17,190, in lieu of <br />required parkland. <br />