My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-013
LakeElmo
>
City Council
>
Resolutions (1970's to 2020)
>
2010's
>
2018
>
2018-013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2025 11:56:36 AM
Creation date
2/4/2021 8:55:59 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Minimum 15 ft. <br />25 ft. <br />25 ft. <br />Front Yard <br />Setback <br />Minimurn Side 7 ft./8 ft. <br />7 ft./8 ft. <br />10 ft.15 ft. or <br />Yard Setback <br />7.5 ft./7,5 ft. <br />Maximum 50% <br />40% <br />45% <br />Impervious <br />Surface <br />WiS^ Mum Wev"TIFT-nern <br />subject to the following conditions.- <br />1. That PID# 1102921440001 is subdivided to create Parcel 3 as indicated on the Preliminary <br />Plat and that a Zoning Map Amendment is approved to rezone Parcels 1, 2, and 3 from Rural <br />Development Transitional to Village Urban Low Density Residential. <br />2. That the future preliminary plat and preliminary PUD Plans includes parcels with the <br />PID#s 1402921110001, 1102 21430001, and a portion of 1102921440001 . <br />3. That the future Final Plat and PUD Plans submittal identify all requests for flexibility from_ <br />the V-LIAR zoning district. <br />4. That all comments of the City Engineer's Memorandum dated December 5, 2017 be <br />addressed, <br />5. That the Applicant submit additional details on the propose stormwater reuse system and <br />ongoing operations for City review and consideration. Ownership, maintenance and <br />ongoing operational responsibilities must be clearly defined, and City acceptance of <br />ston-nwater reuse must be contingent upon the City agreeing to the ongoing ownership, <br />maintenance and operation plan, including the execution of a stormwater maintenance and <br />easement agreement that addresses stormwater reuse. <br />6. That the Applicant provide a detailed phasing plan with the Final Plat I't Addition <br />application that clearly indicates the phasing of the construction for each public <br />infrastructure component and addresses both construction access to the site and public <br />access for new residents. Temporary cul-de-sacs should be part of the phasing plans and <br />are required for any street with a platted lot with driveway access. <br />7. That the developer provide a trail connecting the trail in the middle of the development to <br />Hamlet on Sunfish Lake trails along with a trail corridor of at least 30 feet in width. The <br />developer shall not receive parkland dedication credit for the trail corridor for cost of <br />construction of the trail. <br />8. That any approval be contingent on complying with Washington County's requirernents <br />and requests pertaining to right-of-way, turn lanes and trail needs as noted in the <br />Washington County Memo dated June 1, 2017. <br />9. Sufficient right-of-way along Lake Elmo Avenue N (CSAH-17) for both the Legacy at <br />Northstar Plat and PID4 14.02,921.11.0001 must be provided. Verification from <br />Washington County that sufficient right-of-way along Lake Elmo Avenue N (CSAH- 17) <br />has been provided must be received by the City. <br />M <br />Resolution 2018-013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.