Laserfiche WebLink
Landscape Architect must review and approve all final landscape plans before the City will <br />release the final plat for recording or before the start of construction or grading. <br />8. That the final Plat and final PUD Plans include updated open space and impervious surface <br />calculations. <br />9. That the, final plat show a drainage and utility casement over the wetland and the wetland buffers, <br />including the 100-year high water level. <br />10. That the developer or contractor install an 8-foot-wide bituminous trail along Hudson Boulevard <br />and along the future north/south road (Julia Avenue) as part of this development, <br />11. That the applicant provide the City fees in lieu of park land dedication as required by Section <br />153,14 with the final plat. <br />12. That if the applicant wants amenity points for theming, that they provide the City for staff <br />approval specific examples of proposed development fencing, landscaping, lighting and site <br />furnishings, that will meet the standards outlined in the Lake Elmo Branding and Theming Study. <br />The design acid placement of these elements and features shall be subject to City staff approval. <br />13. That the final plat and final PUD Plans subn-Attal include detailed architectural plans for the <br />exterior of the buildings (including colors and a listing of all exterior materials) for staff review <br />and approval, (Complete) <br />14. That the applicant receives a permit from the Valley Branch Watershed District and South <br />Washington Watershed District for the construction of the proposed development, (Pending) <br />15. That the Final project plans shall include a complete storm water management plan and <br />construction plans that provide all design details for the proposed underground storage systems <br />including details regarding building roof drainage connections. These plans also must <br />incorporate storm water management for the Hudson Boulevard and Julia Avenue Street <br />improvements including the future east bound left turn lane along Hudson Boulevard at Julia <br />Avenue and must meet all City, VBWD and SWWD requirements. (Pending) <br />16, All storm water facilities internal to the site shall be privately owned and maintained. A storm <br />water maintenance and easement agreement in a form acceptable to the City shall be executed <br />and recorded with the final plat, <br />17. That the Final Plat approval is conditioned upon the applicant meeting all City standards and <br />design requirements unless specifically addressed otherwise in these conditions. <br />18. That the PUD overlay zoning allow for the following: <br />a. Setbacks. <br />Springs Apartments at Lake Elmo Minimum Building Setbacks <br />Front (Hudson Blvd). <br />20 ft, <br />Interior Side <br />10 ft, <br />Comer Side (Julia Avenue) <br />10 ft. <br />Rear (north property line) <br />20 ft. <br />Rear (north property line — <br />detached garages) <br />10 ft. <br />b. Attached Garages: That the attached garages shall not exceed 1,000 sq. ft. in area at the <br />ground floor level except by conditional use permit. <br />c. Detached Garages: That the detached garages shall not exceed 3,000 sq. ft. in area at the <br />ground floor level, <br />3 <br />