4. If applicable, the Final Plat be contingent upon the City receiving separate drainage and utility <br />easements in the City's standard form of easement agreement for all off -site development <br />improvements (beyond the plat limits). All off -site easements must be clearly shown on the street, <br />grading and utility plans, with all dimensions labeled. The easements must be obtained before the <br />start of construction. <br />5. Before the execution of the Final Plat by City officials, the Developer shall enter into a <br />Development Agreement acceptable to the City Attorney and approved by the City Council that <br />delineates who is responsible for the design, construction, and payment of the required <br />improvements and shall include the payment of required park dedication fees for the Legacy at <br />North Star Third Addition Final Plat with financial guarantees therefore. <br />6. A Landscape License Agreement shall be prepared for the maintenance of commonly held <br />homeowners' association -owned and City -owned outlets, right-of-ways, and medians before the <br />release of the final plat by City Officials. <br />7. That the developer provide a trail connecting to the trails of Hamlet on Sunfish Lake. The Applicant <br />shall not receive parkland dedication credit for the trail outlot or easement or construction of the <br />trial. <br />8. That the developer provide the City written verification from Washington County that sufficient <br />right-of-way has been provided on the plat along with a sufficient right-of-way easement along the <br />property to the south of the development before plat recording. Prior to construction, the plan <br />section detailing southbound right turn lanes and center left turn lanes at 391h Street must be <br />submitted and approved by the county traffic engineer, applicable Washington County right-of- <br />way permits must be obtained, drainage report and calculations must be submitted, and access <br />control shall be dedicated to Washington County along CSAH 17/Lake Elmo Avenue frontage. <br />The Applicant shall be solely responsible for all construction costs associated with the intersection <br />improvements as recommended by Washington County. (Complete) <br />9. If still needed, that the applicant provide a Roadway, Drainage and Utility Easement in City <br />standard form of roadway easement agreement, along Lake Elmo Avenue (CSAH 17) from the <br />southern boundary to Stillwater Boulevard North (CSAH 14), and consistent with the requirements <br />of the preliminary plat approval. <br />10. That the Landscape Plans for this phase of the development be approved by the City's Landscape <br />Architect before recording of final plat. <br />11. That the applicant include in the Architectural Control guidelines for this phase of the development <br />the requirements that villa lots utilize 4-sided architecture and garages facing the public right-of- <br />ways to have windows and/or other architectural features. <br />12. That the applicant address all Fire Chief and Building Official comments in the final project plans. <br />13. That street names shall comply with City's Street Naming Policy. <br />14. That the applicant pay the City the required parkland dedication fee applicable to this phase of the <br />development, which is equivalent to a land dedication of 0.645 acres, before the City releases the <br />final plat for recording. <br />0 <br />