Laserfiche WebLink
15. That the applicant notify all home builders about possible City outdoor watering restrictions and <br />that the home builders notify all home buyers that the City may impose limits on outdoor water use <br />including no watering of grass or sod, unless the applicant is notifies by the city that this notice is <br />no longer required. Said decision about whether or not this notice is no longer required shall be <br />made at the sole discretion of the City. The applicant shall have the city approve the notification <br />message before recording the final plat. <br />16. Except for along 4 1 " Street north, at the required stub street (Kokanee Avenue North) and on Lots <br />3 and 4, Block 3, that the developer provide a 30 foot -wide open space buffer along to the northern <br />development line as well as a 50 foot -wide open space buffer along the western line of the <br />development. The City must approve the form of this buffer or easement before releasing the final <br />plat for recording. For Lots 3 and 4, Block 3, the developer shall provide the City a detailed site, <br />landscaping and/or berming plan for each lot that would be subject to City staff approval. This <br />plan is to maximize the size of the buffer and no disturb (no build area) on each lot and is to show <br />sufficient landscaping with trees and/or berming along the north property line of each lot to provide <br />screening. These plans for each lot shall be subject to City staff approval and the no -disturb buffer <br />area for each lot shall be included in the conservation easement or in another protective easement <br />for the development. <br />17. That the development utilize Traditionaire LED Downlights from Xcel Energy for the development <br />in lieu of the Street Light Type/Pole of Acorn with aluminum pole (all black) indicated in the City's <br />Engineering Standards and that streetlights be located only at intersections and at the ends of cul- <br />de-sacs. <br />18. The developer record the approved final plat with Washington County within 180 days after City <br />Council approval. Failure to record the final plat within 180 days of approval will cause the <br />approval to become void. <br />Passed and duly adopted this 7th day of April, 2020 by the City Council of Lake Elmo, <br />Minnesota. <br />i� <br />Mike Pearson, Mayor <br />ATTEST: <br />9liJhnso , C' Clerk <br />