My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-043
LakeElmo
>
City Council
>
Resolutions (1970's to 2020)
>
2020's
>
2020
>
2020-043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2025 2:35:33 PM
Creation date
2/4/2021 8:58:16 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
addition to the BP District was approved by the City as a conditional use provided <br />that certain specific conditions were met, including that it must be on property of at <br />least 10 acres in size or more. See City Code § 154.550(0). <br />I. At the time of the CUP approval, the City Council approved the Preliminary <br />and Final Plat to allow the Four Corners development, which included the Property, <br />and created an 11-acre parcel for the School District. (See Ex. 6, Preliminary Plat <br />Application.) <br />J. As part of the School District's applications, it provided a Plan for Bus <br />Facility hnprovements, which included significant paving over the 11-acre Property, <br />the inclusion of stormwater ponds, a watermain easement, a 10-foot small utility <br />easement, and a utility plan. (Ex. 7.) <br />K. The Staff Report for Agenda Item #17, on July 17, 2018, noted "Because the <br />property is guided in the City's Comprehensive Plan for 2020-2030 Regional Sewer <br />Staging Plan and would discharge to the MCES Cottage Grove Ravine Interceptor, <br />provisions for connecting to the municipal sanitary sewer service must be included <br />with this application," and "Because the property is located in the MUSA, <br />provisions for connecting to the municipal water supply must be included." (Ex. 6.) <br />L. The City Engineer provided a Memorandum, dated May 30, 2018, which <br />was an engineering review of the plans for the Four Corners development, including <br />the Stillwater Bus Facility Site Plans. (Ex. 8.) The Memorandum provided <br />comments and recommendations for Stormwater Management, Streets and <br />Transportation, Municipal Sanitary Sewer, and Municipal Water Supply. <br />M. The CUP, i.e., Resolution No. 2018-077, includes, but is not limited to, the <br />following conditions relevant to the current use of the Property: <br />Condition # 2: No construction or use of the bus terminal (unless in <br />accordance with the Interim use Permit approved by the City by Resolution <br />2014-095) may commence until all items as outlined in the City Engineer <br />review memo regarding the Four Corners Preliminary & Final Plat <br />(Stillwater Transportation Center) dated May 30, 2018 and all other <br />subsequent construction plan memos regarding the Stillwater Transportation <br />Center have been addressed; the Four Corners Ist Addition Final Plat has <br />been recorded. (Ex. 1, p. 4.) <br />Condition # 3: The applicant must obtain all other necessary City, State, and <br />other governing body permits prior to the commencement of any <br />construction activity on the parcel including but not limited to an approved <br />stormwater management plan, utility plans, grading plan, street construction <br />plans (if required), parking lot permit, building permits, etc. (Ex. 1, p. 4.) <br />Condition # 9: The property shall be connected to City sewer and water prior <br />to operation of the bus terminal." (Ex. 1, p. 4.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.