My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-249 Cable Franchise Agreement
LakeElmo
>
City Council
>
Ordinances (1970's to 2021)
>
2020's
>
2021
>
08-249 Cable Franchise Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2026 12:31:48 PM
Creation date
8/25/2022 1:43:14 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A-3 <br />SPECIAL LANGUAGE FOR THE CITY OF GRANT FRANCHISE <br /> <br />In accordance with and subject to the procedures below, Grantee agrees to work with the City of <br />Grant to identify a build-out area within the City of Grant. The City of Grant, at its sole cost and <br />discretion, will solicit written expressions of interest in subscribing to Grantee’s services from <br />residents within the area depicted on the map above, describing those parts of the buildout that the <br />resident will be required to fund. The City of Grant will provide Grantee a list of addresses of <br />responding residents who have expressed interest. The City of Grant has the discretion to determine <br />which residential properties within the area depicted on the map above it will include in any <br />solicitation of written expressions of interest. Grantee will then provide the City of Grant a written <br />estimate of the portion of the cost to each such resident of building out the Cable System to serve <br />that customer. In its cost estimate, Grantee will itemize the cost of the Drop, the cost of the line <br />extension, and the cost of any line extension that must occur on the resident’s property in order to <br />provide Cable Service to that resident. Grantee’s estimates will be based on cost. <br /> <br />The City of Grant may direct Grantee to build out to those residential properties identified in <br />Grantee’s written estimates. Grantee shall bear the cost of construction up to $2,600 per home <br />passed. Grantee is not required to build out to any home directed by the City of Grant to be built <br />out unless, for that home, there is a secure commitment to fund all construction costs (including <br />the node splits and fiber extensions) in excess of $2,600 per home through any combination of <br />funds from the potential subscribers, a grant commitment, or a commitment of any portion of the <br />Construction Credit provided in Section 6.6(b) of the Franchise. <br /> <br />For places within the targeted buildout area on private property with one or more existing poles <br />that are not currently usable by Grantee because of trees, brush, or both, but that could be made <br />usable, the City of Grant or property owner can, at their own choice and not under the direction or <br />request of Grantee, cut back the trees or brush at its own expense, or in combination with the <br />expense of the benefitted property owner(s), to make the existing pole(s) usable by Grantee.
The URL can be used to link to this page
Your browser does not support the video tag.