My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#06 - Parkview-Cardinal Change Order 3
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2023
>
02-21-23
>
#06 - Parkview-Cardinal Change Order 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2025 8:24:06 PM
Creation date
9/28/2023 9:35:25 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE ORDER NO.3 <br />PARKVIEW-CARDINAL STREET AND UTILITY IMPROVEMENTS <br />CITY OF LAKE ELMO, MINNESOTA <br />PROJECT NO. 2020.121 <br />QUANTITY UNIT PRICE AMOUNT <br />CHANGE ORDER ITEMS <br />CO3-1 LF -1,270 $74.88 -$95,097.60 <br />CO3-2 LF -630 $41.60 -$26,208.00 <br />CO3-3 LF 600 $54.08 $32,448.00 <br />CO3-4 EA -6 $826.80 -$4,960.80 <br />CO3-5 LF 1,270 $135.00 $171,450.00 <br />CO3-6 LBS 100 $7.28 $728.00 <br />CO3-7 CY 2,250 $33.00 $74,250.00 <br />CO3-8 CY 720 $45.00 $32,400.00 <br />CO3-9 CY 1,425 $48.00 $68,400.00 <br />CO3-10 EA 5 $468.00 $2,340.00 <br />CO3-11 EA 5 $104.00 $520.00 <br />CO3-12 SY 80 $5.00 $400.00 <br />CO3-13 SY 80 $28.00 $2,240.00 <br />CO3-14 CY 130 $35.00 $4,550.00 <br />CO3-15 SEED MIXTURE 25-131 & EROSION CONTROL BLANKET SY 950 $6.92 $6,574.00 <br />SUBTOTAL CHANGE ORDER ITEMS $270,033.60 <br />2023 UNIT PRICE INCREASE ITEMS <br />CO3-16 LS 1 $75,000.00 $75,000.00 <br />CO3-17 LS 1 $15,000.00 $15,000.00 <br />CO3-18 LF 6,030 $1.83 $11,034.90 <br />CO3-19 SF 80 $1.40 $112.00 <br />CO3-20 SF 30 $1.87 $56.10 <br />CO3-21 SY 145 $12.70 $1,841.50 <br />CO3-22 SF 610 $3.27 $1,994.70 <br />CO3-23 SF 112 $6.90 $772.80 <br />CO3-24 SY 150 $5.60 $840.00 <br />CO3-25 TN 695 $16.00 $11,120.00 <br />CO3-26 TN 925 $16.00 $14,800.00 <br />CO3-27 SY 7,300 $1.78 $12,994.00 <br />SUBTOTAL UNIT PRICE INCREASE ITEMS $145,566.00 <br />STORED MATERIALS ON HAND ITEMS <br />CO3-28 LF 1,270 $19.48 $24,739.60 <br />CO3-29 LS 1 $898.90 $898.90 <br />CO3-30 LS 1 $2,579.69 $2,579.69 <br />SUBTOTAL STORED MATERIALS ON HAND ITEMS $28,218.19 <br />TOTAL - CHANGE ORDER NO. 3 $443,817.79 <br />10" HDPE WATERMAIN (MATERIAL COST, INCL TAX) <br />10" WATER SERVICE SADDLES (MATERIAL COST, INCL TAX) <br />10" HDPE TO 8" DIP TRANSITION FITTING (MATERIAL COST, INCL TAX) <br />MOBILIZATION <br />TRAFFIC CONTROL <br />B418 CONCRETE CURB AND GUTTER <br />4" CONCRETE WALK <br />6" CONCRETE FLUME <br />6" CONCRETE DRIVEWAY PAVEMENT <br />6" CONCRETE PEDESTRIAN RAMP <br />TRUNCATED DOME PANELS <br />PATCH BITUMINOUS DRIVEWAYS / TRAIL <br />TYPE SP 9.5 BITUMINOUS WEARING COURSE MIXTURE (2,C) <br />TYPE SP 12.5 BITUMINOUS NON WEARING COURSE MIXTURE (2,C) <br />SOD <br />TOPSOIL BORROW (LV) <br />10" HDPE WATERMAIN, DIRECTIONAL DRILL <br />1.5" TYPE "K" COPPER WATER SERVICE, DIRECTIONAL DRILL <br />1.5" TYPE "K" COPPER WATER SERVICE <br />10" HDPE TO 8" DIP TRANSITION FITTING <br />8" DIP, CL. 52 WATER MAIN <br />DUCTILE IRON FITTINGS <br />COMMON EXCAVATION (EV) <br />PATCH BITUMINOUS DRIVEWAY / TRAIL <br />CLEARING <br />GRUBBING <br />REMOVE AND DISPOSE OF BITUMINOUS PAVEMENT (DRIVEWAY / TRAIL) <br />6" MnDOT CLASS 6 AGGREGATE BASE (CV) <br />DESCRIPTION / JUSTIFICATIONITEM DESCRIPTION OF PAY ITEM UNIT CHANGE ORDER <br />SELECT GRANULAR BORROW (CV)
The URL can be used to link to this page
Your browser does not support the video tag.