Laserfiche WebLink
CITY OF LAKE ELMO, MN | PROJECT NO. 2020.121 MEASUREMENT AND PAYMENT 1200-1 <br />SECTION 1200 – MEASUREMENT AND PAYMENT – CHANGE ORDER NO. 3 <br /> <br /> <br />SCOPE <br /> <br />This Section covers method of measurement and payment for the items of Work under this Contract. <br /> <br /> <br />GENERAL REQUIREMENTS <br /> <br />The BID FORM shall cover all Work shown on the contract drawings and/or required by the Specifications. All costs <br />in connection with the Work including furnishing of all materials, providing all construction plant and equipment, <br />and performing all necessary labor, coordination, supervision, and management to fully complete the Work; shall <br />be included in the Unit or Lump Sum prices quoted in the BID FORM. All Work not specifically set forth as a pay item <br />in the BID FORM shall be considered a subsidiary obligation of the Contractor and all costs in connection therewith <br />shall be included in the amounts and prices submitted in the BID FORM. <br /> <br /> <br />METHOD OF MEASUREMENT FOR PAYMENT <br /> <br />The following methods of measurement for payment will be used to derive the quantities installed: <br /> <br />A. DIVISION 3 – WATERMAIN: <br /> <br />1. Ductile Iron Watermain Pipe shall be measured by the Linear Foot, complete in place at the depth specified <br />in the plans for each size and type of pipe and paid at the price quoted in the CHANGE ORDER FORM. <br />B. DIVISION 5 – STREETS CONSTRUCTION: <br /> <br />1. Common Excavation (EV) – Ivy Ave shall be measured by the Cubic Yard (Excavated Volume) as measured in <br />the field and paid the price quoted in the CHANGE ORDER FORM. The unit price shall include all materials, <br />labor, and equipment required to excavate, load, haul, place onsite and dispose offsite. The price shall <br />include offsite disposal of excess material. Salvaging and re-spreading topsoil shall be considered incidental <br />to Common Excavation. This item is intended for the existing street area that will be removed and replaced <br />with full street section (3.5"-BItuminous, 6"-Class 6 and 12"-Select Granular) due to the open cut installation <br />of watermain. <br />2. Select Granular Borrow (CV) – Ivy Ave shall be measured by the Cubic Yard (Compacted Volume) as measured <br />in the field and paid at and price quoted in the CHANGE ORDER FORM, including loading, hauling, placing <br />and compacting. <br />3. MnDOT Class 6 Aggregate Base (CV) – Ivy Ave: Base material measured by the Cubic Yard (Compacted <br />Volume) as measured in the field and paid at and price quoted in the CHANGE ORDER FORM, including <br />loading, hauling, placing and compacting. <br /> <br /> <br />END OF SECTION