My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#09 - Royal Golf 5th Addn DA
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2023
>
02-21-23
>
#09 - Royal Golf 5th Addn DA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2025 8:24:06 PM
Creation date
9/28/2023 9:35:30 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> 8 <br />LA515-119-849077.v5 <br />amending this Agreement if necessary to reflect the extended completion date. Final wear course <br />placement outside of this time frame must have the written approval of the City Engineer. <br />12. MAINTENANCE DURING CONSTRUCTION. The Developer shall be responsible for <br />all maintenance of the Subdivision Improvements including the snow plowing of the streets, roads <br />and alleys until the Subdivision Improvements are accepted by the City in writing. The Developer <br />and its contractors must adhere to the City’s weight restrictions for all streets both inside and <br />outside of the Subdivision, regardless of whether said streets are included in the City’s map of <br />streets with weight restrictions and regardless of whether said streets are fully constructed. The <br />Developer also is responsible to locate all underground utilities until the Subdivision is accepted <br />in writing by the City. Warning signs shall be placed by the Developer when hazards develop in <br />streets to prevent the public from traveling on same and to direct attention to detours. If and when <br />streets become impassable, such streets shall be barricaded and closed by the Developer. In <br />the event residences are occupied prior to completing streets, the Developer shall maintain a <br />smooth surface and provide proper surface drainage to ensure that the streets are passable for <br />traffic and emergency vehicles. The Developer shall be responsible for keeping streets within <br />and without the Subdivision clean and clear of dirt and debris that may spill, track, or wash onto <br />the street from the Developer’s operations. The Developer shall contract for street cleaning for <br />streets within and immediately adjacent to the Subdivision. At a minimum, scraping and sweeping <br />shall take place on a weekly basis. <br />Prior to the City’s acceptance of the streets the City may agree, at the City’s sole <br />discretion, to keep the streets open during winter months by plowing snow. The City will consider <br />snow plowing streets on a case by case basis and under the following conditions: 1) the Developer <br />must request in writing the streets it is requesting to be plowed by the City, with such request <br />received prior to October 1st of each winter season that plowing is requested; 2) there must be <br />residences along the street; 3) for streets that do not have the bituminous wear course placed,
The URL can be used to link to this page
Your browser does not support the video tag.