My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#09 - Royal Golf 5th Addn DA
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2023
>
02-21-23
>
#09 - Royal Golf 5th Addn DA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2025 8:24:06 PM
Creation date
9/28/2023 9:35:30 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> 9 <br />LA515-119-849077.v5 <br />the Developer must install paved wedges along all curb lines and catch basins of the street; 4) <br />gate valves and manholes must be level with the pavement surface; 5) street curves, center <br />medians, and other protrusions in the rights-of-way must be delineated with “HI-VIS” fiberglass <br />stakes; 6) a site review must be scheduled by the Developer and conducted with the City’s Public <br />Works Department with the Developer in attendance to review the streets that are being <br />requested to be plowed prior to the commitment of plowing by the City; 7) the Developer must <br />agree not to hold the City responsible for any damage caused by snow plowing operations to the <br />streets, curb and gutter, manholes, catch basins or other infrastructure; and 8) the Developer shall <br />enter into an agreement with the City for plowing of the streets. <br />13. LICENSE. The Developer hereby grants the City, its agents, employees, officers, and <br />contractors a license to enter the Property to perform all work and inspections deemed <br />appropriate by the City in conjunction with the development of the Property and this Agreement. <br />14. CONSTRUCTION ACCESS. Construction traffic access and egress for grading, public <br />utility construction, and street construction is restricted to access the Subdivision via 20th Street <br />North or from Lake Elmo Avenue (County Road 17). No construction traffic is permitted on other <br />adjacent local streets. <br />15. CONSTRUCTION SEQUENCE AND COMPLIANCE. The City will require the <br />Developer to construct the Subdivision Improvements in a sequence which will allow progress <br />and compliance points to be measured and evaluated. The Developer and the Developer’s <br />representatives are required to supervise and coordinate all construction activities for all <br />Subdivision Improvements and must notify the City in writing stating when the work is ready for <br />the inspection at each of the measurable points defined in the following paragraphs. <br />16. EROSION CONTROL. All construction regarding the Subdivision Improvements shall <br />be completed in a manner designed to control erosion and in compliance with the approved plans <br />and specifications for the construction, the City Code, the City’s Engineering Design and
The URL can be used to link to this page
Your browser does not support the video tag.