Laserfiche WebLink
QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT <br />ITEM DESCRIPTION OF PAY ITEM UNIT <br />CONTRACT THIS PERIOD TOTAL TO DATE <br />66 LF 832 $41.00 $34,112.00 28.00 $1,148.00 683.00 $28,003.00 <br />67 LF 50 $90.05 $4,502.50 0.00 $0.00 31.00 $2,791.55 <br />68 LF 1320 $77.75 $102,630.00 6.00 $466.50 1,287.00 $100,064.25 <br />69 EACH 5 $4,946.00 $24,730.00 0.00 $0.00 5.00 $24,730.00 <br />70 EACH 7 $6,737.50 $47,162.50 0.00 $0.00 7.00 $47,162.50 <br />71 EACH 1 $21,086.00 $21,086.00 0.10 $2,108.60 1.00 $21,086.00 <br />72 EACH 1 $6,250.50 $6,250.50 0.00 $0.00 1.00 $6,250.50 <br />73 EACH 8 $556.50 $4,452.00 0.00 $0.00 1.00 $556.50 <br />74 CY 30 $113.00 $3,390.00 0.00 $0.00 27.00 $3,051.00 <br />75 LF 2835 $22.00 $62,370.00 -13.00 -$286.00 2,787.00 $61,314.00 <br />76 SY 460 $99.00 $45,540.00 -34.00 -$3,366.00 266.00 $26,334.00 <br />77 SY 125 $145.00 $18,125.00 10.00 $1,450.00 40.00 $5,800.00 <br />78 EACH 17 $102.00 $1,734.00 17.00 $1,734.00 25.00 $2,550.00 <br />79 SF 240 $110.00 $26,400.00 28.63 $3,149.30 376.63 $41,429.30 <br />80 LF 80 $78.00 $6,240.00 0.00 $0.00 0.00 $0.00 <br />81 LS 1 $2,251.00 $2,251.00 0.10 $225.10 1.00 $2,251.00 <br />82 SF 16.75 $148.00 $2,479.00 15.75 $2,331.00 15.75 $2,331.00 <br />83 LF 1000 $2.25 $2,250.00 0.00 $0.00 364.00 $819.00 <br />84 EACH 1 $2,180.00 $2,180.00 0.00 $0.00 0.00 $0.00 <br />85 EACH 13 $136.50 $1,774.50 0.00 $0.00 0.00 $0.00 <br />86 CY 750 $40.00 $30,000.00 536.50 $21,460.00 536.50 $21,460.00 <br />87 SY 4050 $10.00 $40,500.00 4,327.00 $43,270.00 4,327.00 $43,270.00 <br />88 LB 3000 $2.00 $6,000.00 1,400.00 $2,800.00 1,400.00 $2,800.00 <br />89 SY 1500 $2.80 $4,200.00 470.00 $1,316.00 470.00 $1,316.00 <br />90 LF 1200 $3.15 $3,780.00 0.00 $0.00 200.00 $630.00 <br />91 ACRE 1 $2,369.50 $2,369.50 0.50 $1,184.75 0.50 $1,184.75 <br />92 SF 108 $17.75 $1,917.00 0.00 $0.00 0.00 $0.00 <br />$1,898,658.75 $194,435.78 $1,642,018.92 <br />ALTERNATE B: LIFT STATION <br />93 LS 1 $398,000.00 $398,000.00 0.10 $39,800.00 0.95 $378,100.00 <br />$398,000.00 $39,800.00 $378,100.00 <br />CHANGE ORDER NO. 1 <br />CO 1-1 LS 1 $62,390.00 $62,390.00 0.00 $0.00 1.00 $62,390.00 <br />$62,390.00 $0.00 $62,390.00 <br />CHANGE ORDER NO. 2 <br />CO 2-1 LS 1 $4,414.85 $4,414.85 0.00 $0.00 1.00 $4,414.85 <br />$4,414.85 $0.00 $4,414.85 <br />TOTALS: BASE CONTRACT + ALTERNATE B + CHANGE ORDERS $2,363,463.60 $234,235.78 $2,086,923.77 <br />CONSTRUCT DRAINAGE STRUCTURE DES. 406 - 60" (W/ CASTING) <br />CURB STOP & BOX CASTING (R-1914-A) <br />RANDOM RIP-RAP, CLASS III (INCLUDES GEOTEXTILE FABRIC) <br />DEWATERING DISCHARGE LOCATION CHANGE <br />CHANGE ORDER NO. 1 - TOTAL <br />ALTERNATE B BID TOTALS <br />LIFT STATION TRADITIONAL CONCRETE <br />B618 CONCRETE CURB & GUTTER <br />6" CONCRETE DRIVEWAY PAVEMENT <br />6" WATER MAIN DIP - CL 52 (POLY ENCASED) <br />8" WATER MAIN DIP - CL 52 (POLY ENCASED) <br />CONSTRUCT DRAINAGE STRUCTURE DES. 404 (W/ CASTING) <br />CONSTRUCT DRAINAGE STRUCTURE DES. 406 - 48" (W/ CASTING) <br />CONSTRUCT DRAINAGE STRUCTURE DES. 405 - 60" (W/ 4' SUMP, MH BAFFLE & CASTING <br />1" TYPE K COPPER PIPE <br />LIFT STATION ELECTRICAL SERVICE LINE <br />CHANGE ORDER NO. 2 - TOTAL <br />SEDIMENT CONTROL LOG <br />SEEDING (SEED MIXTURE TYPE 25-141) <br />CROSSWALK PREFORMED THERMOPLASTIC GROUND IN <br />FURNISH AND INSTALL SIGN, TYPE C <br />8" CONCRETE DRIVEWAY PAVEMENT (AT LIFT STATION) <br />SALVAGE AND INSTALL MAILBOX ASSEMBLY <br />WET CAST BLOCK RETAINING WALL <br />FURNISH AND INSTALL 4' CHAIN LINK FENCE <br />TRAFFIC CONTROL/ MAINTENANCE OF ACCESS <br />SILT FENCE, PREASSEMBLED <br />TEMPORARY ROCK CONSTRUCTION ENTRANCE <br />STORM DRAIN INLET PROTECTION <br />COMMON TOPSOIL BORROW (PULVERIZED) (LV) <br />SODDING, TYPE MINERAL <br />HYDRAULIC BONDED FIBER MATRIX <br />EROSION CONTROL BLANKET CATEGORY 3N <br />BASE BID TOTALS