Laserfiche WebLink
PRELIMINARY PLAT APPLICATION <br />& PLANNED UNIT DEVELOPMENT (PUD) APPLICATION <br />UPDATE 11.03.23 <br /> <br />shown; (5) the grading must include and show the stormwater basin maintenance access roadway to <br />the infiltration basin and to all inlet/outlet structures (meeting all city design standards). <br />Response: (1) all spot elevations for corners (existing and proposed) are provided; (2) This <br />information has been provided, please see Typical Lot Detail on Sheets #17 and 18; (3) This <br />information has been provided, please see Sheets 17 and 18 (4) This information has been <br />provided, please see Sheets 6 and 7 (site plan) and also Sheets 17 and 18 (grading plan); (5) <br />This information has been provided and shown by a gray hatch on Sheets 17 and 18. Also see <br />legend. <br /> <br />Comment 5: Storm sewer must be redesigned and resubmitted meeting city design standards for the <br />minimum pipe cover of 3.0 feet. <br />Response: This item has been addressed. <br /> <br />Comment 6: The street typical section must be updated to acknowledge and include the boulevard <br />trees and drain tile per city standard details. <br />Response: Please see Sheet 8 for update typical section detail. Boulevard trees have been <br />removed due to city required utility clearances. <br /> <br />Comment 7: The sidewalk connection to Sunflower Drive remains missing. <br />Response: Please see sheet insert on Sheet 6 for this connection. <br /> <br />Comment 8: Street lighting plan is completely wrong and does not comply with city design standards. <br />Wrong fixtures and wrong placement. Street lights need to be per city standard Xcel fixture and pole <br />and should be placed at intersections with Wildflower Drive and end of cul-de-sacs only. <br /> <br /> Response: This comment has been addressed. Please see updates on Sheets 32 and 33. <br /> <br />Comment 9: No parking signage is required along cul-de-sacs. <br />Response: Please see Sheets 32 and 33. <br /> <br />Comment 10: Landscape plans must be submitted on scaled drawings and must show all underground <br />utilities. Tree plantings must be revised to eliminate underground utility conflicts. <br />Response: This comment has been addressed. Please see revised Landscape Plans. <br /> <br />Stormwater Management Report <br /> <br />Comment 1: Exact and proposed discharge rates must be mitigated for all points of discharge (appears <br />to be 6 discharge locations). Update rate control table to report exact and proposed discharge rates for <br />all points of discharge and combined, and for all storm events. <br />Response: The stormwater report has been updated with tables for discharge rates at each <br />discharge point. <br />