Laserfiche WebLink
15. Drivers should expect off-peak lane closures between Stillwater Blvd. and Greely St. through <br />August. <br />Once Hwy 36 is open to full capacity in both directions, the intersections of Hwy 36 and <br />Demontreville Trail and Keats Ave. will fully reopen to traffic. <br />​MnDOT urges motorists to always be attentive, drive with caution, slow down in work zones <br />where workers are present. Please follow the posted detour route and avoid traveling through <br />residential neighborhoods for the safety of those that live in the area. <br />All construction activities and traffic impacts are weather dependent and subject to change. <br />For more information on the Highway 36 Project click here: MNDOT <br />Metro - I-94 Oakdale to St. Croix: <br />2022-2025 construction <br />Eastbound I-94 lane closure in <br />Washington County begins July 18 <br />Beginning at 5 a.m. Mon, July 18, eastbound I-94 will be reduced to two lanes of traffic between <br />Woodbury Dr. and the St. Croix River in the east metro through late October. <br />Construction crews will be reinforcing the road shoulders along this stretch of eastbound I-94 in <br />preparation for pavement resurfacing in 2023. Shoulder reinforcement includes removing the <br />current pavement and replacing it with a thicker layer of pavement that can withstand high traffic <br />volumes. Crews will use the road shoulders to maintain two lanes of traffic in each direction on I- <br />94 during next year’s construction. <br />No ramp closures are planned as part of this work in 2022.