My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#05 - Easton Village 6th & 7th Add DA
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
03-19-24
>
#05 - Easton Village 6th & 7th Add DA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2025 11:59:05 AM
Creation date
8/16/2024 2:10:20 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />10 <br />LA515\89\721081.v13 <br />supplementary instructions received from the City, the City may take such action as it deems <br />appropriate to control erosion. The City will endeavor to notify the Developer in advance of any <br />proposed action, but failure of the City to do so will not affect the Developer’s and City’s rights or <br />obligations hereunder. If the Developer does not reimburse the City for any cost the City incurred <br />for such work within 10 days, the City may draw down the Security to pay any costs. The City will <br />not allow any development or site work, utility, or street construction and will not issue any building <br />permits unless the Subdivision is in full compliance with the approved erosion control plan. <br />If the City issues building permits before the acceptance of public Subdivision <br />Improvements, the Developer assumes all responsibility for erosion control compliance <br />throughout the Subdivision and the City may take such action as allowed by this Agreement <br />against the Developer for any noncompliant issue as stated above. The City will require erosion <br />control plans for individual lots in accordance with the City’s building permit requirements, or as <br />required by the City or City Engineer. <br />17. SITE GRADING. In order to construct the Subdivision Improvements and otherwise <br />prepare the Subdivision for development, it will be necessary for the Developer to grade the <br />Subdivision. All grading must be done in compliance with this Agreement and the approved <br />grading plans. Within 30 days after completion of the grading, the Developer shall provide the <br />City with an “as built” grading plan and a certification by a registered land surveyor or engineer <br />as required in the City’s Engineering Design and Construction Standards Manual. <br />18. STREET AND UTILITY IMPROVEMENTS. All storm sewers, sanitary sewers, <br />watermain, and streets, including turn lane and intersection improvements, shall be installed in <br />accordance with the approved Plans, the City approvals, the City Code, and the City’s <br />Engineering Design and Construction Standards Manual. Curb and gutter, the first lift of the <br />bituminous streets, sidewalks, boulevards graded, street signs installed, and all restoration work <br />on the site shall be completed in accordance with the approved Plans. Once the work is
The URL can be used to link to this page
Your browser does not support the video tag.