My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#05 - Easton Village 6th & 7th Add DA
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
03-19-24
>
#05 - Easton Village 6th & 7th Add DA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2025 11:59:05 AM
Creation date
8/16/2024 2:10:20 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />11 <br />LA515\89\721081.v13 <br />completed, the Developer or the Developer’s representative shall submit a written request by <br />email to the City asking for an inspection of the initial improvements. The City will then schedule <br />a walk- through to create a punch list of outstanding items to be completed. Upon receipt of the <br />written punch list provided by the City, the punch list items must be completed by the Developer <br />and the City notified to re- inspect the improvements. The final bituminous wear course shall be <br />installed by the Developer after the first bituminous course has weathered a winter season. <br />Before the placement of the final bituminous wear course, the Developer shall repair or replace <br />all broken or failing curbs, sidewalks and damaged or settled streets as determined by the City <br />from a pre-wear course walk through inspection. <br />19. LANDSCAPING AND TREE REPLACEMENT IMPROVEMENTS. <br />A. The Developer agrees to install or cause to be installed landscaping in accordance <br />with the approved Plans, the City approvals, the City Code, the City’s Engineering <br />Design and Construction Standards Manual, and the City’s Landscape and Irrigation <br />Standards. All landscaping materials such as trees, shrubs, grasses, or other <br />vegetation installed by the Developer must be warrantied and maintained for a period <br />of two years. The two-year warranty period shall be deemed to start once all required <br />landscaping identified as responsibility of Developer in the approved Plans has <br />received acceptance by the City. The Developer agrees to have the installer <br />complete an inspection 30 days prior to the end of the two-year warranty period and <br />provide the City with a written report identifying the condition of all landscaping. In <br />the event any landscaping installed by the Developer is deemed to be in poor <br />condition or dead, the Developer is to replace the landscaping with like kind materials <br />or as otherwise approved by the City. <br />B. The Developer shall be responsible for maintaining regular watering, fertilizing, and <br />over-seeding necessary to establish final lawns and yards as identified in the <br />approved Plans for outlots, public rights-of-way, and any disturbed areas outside the
The URL can be used to link to this page
Your browser does not support the video tag.