My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#06 - Northstar 1st Add DA
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
03-19-24
>
#06 - Northstar 1st Add DA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2025 11:59:51 AM
Creation date
8/16/2024 2:10:24 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> 11 <br />LA515\112\937837.v1 <br />Improvements, the Developer assumes all responsibility for erosion control compliance <br />throughout the Subdivision and the City may take such action as allowed by this Agreement <br />against the Developer for any noncompliant issue as stated above. Erosion control plans for <br />individual lots will be required in accordance with the City’s building permit requirements, or as <br />required by the City or City Engineer. <br />17. SITE GRADING. In order to construct the Subdivision Improvements and otherwise <br />prepare the Property for development, it will be necessary for the Developer to grade the <br />Subdivision. All grading must be done in compliance with this Agreement and the approved <br />grading plans. Within thirty (30) days after completion of the grading, the Developer shall provide <br />the City with an “as built” grading plan and a certification prepared by a registered land surveyor <br />or engineer as required in the City’s Engineering Design and Construction Standards Manual. <br />18. STREET AND UTILITY IMPROVEMENTS. All storm sewers, sanitary sewers, <br />watermain, and streets, including turn lane and intersection improvements, shall be installed in <br />accordance with the approved Plans, the City approvals, the City Code, and the City’s <br />Engineering Design and Construction Standards Manual. Curb and gutter, the first lift of the <br />bituminous streets, sidewalks, boulevards graded, street signs installed, and all restoration work <br />on the site shall be completed in accordance with the approved Plans. Once the work is <br />completed, the Developer or the Developer’s representative shall submit a written request to the <br />City asking for an inspection of the initial improvements. The City will then schedule a walk- <br />through to create a punch list of outstanding items or repairs the Developer is to complete. Upon <br />receipt of the written punch list provided by the City, the Developer must complete all items on <br />the punch list and then notify the City to re-inspect the Improvements. The Developer shall install <br />the final bituminous wear course after the first bituminous course has weathered a winter season. <br />Prior to placement of the final bituminous wear course, the Developer shall repair or replace all <br />broken or failing curbs, sidewalks and damaged or settled streets as determined by the City from
The URL can be used to link to this page
Your browser does not support the video tag.