Laserfiche WebLink
<br /> 10 <br />LA515\112\937837.v1 <br />representatives are required to supervise and coordinate all construction activities for all <br />Subdivision Improvements and must notify the City in writing stating when the work is ready for <br />the inspection at each of the measurable points defined in the following paragraphs. <br />16. EROSION CONTROL. All construction regarding the Subdivision Improvements shall <br />be completed in a manner designed to control erosion and in compliance with the approved plans <br />and specifications for the construction, the City Code, the City’s Engineering Design and <br />Construction Standards Manual, all watershed district permits, the Minnesota Pollution Control <br />Agency’s best management practices, and other requirements including the City’s permit with the <br />Minnesota Pollution Control Agency for the municipal separate storm sewer system program. <br />Before initiating any work on the site, an erosion control plan must be implemented by the <br />Developer and inspected and approved by the City. Erosion and sediment control measures shall <br />be coordinated with the various stages of development. The City may impose additional erosion <br />control requirements at any stage in development as deemed necessary to maintain a compliant <br />site. All areas disturbed for site improvements must be reseeded by the Developer promptly after <br />the work in the area is complete unless construction of the next stage of the site improvements <br />will begin in that area within seven (7) days. The parties recognize that time is of the essence in <br />controlling erosion. <br /> If the Developer does not comply with the erosion control plan and schedule or <br />supplementary instructions received from the City, the City may take such action as it deems <br />appropriate to control erosion. The City will endeavor to notify the Developer in advance of any <br />proposed action, but failure of the City to do so will not affect the Developer's and City's rights or <br />obligations hereunder. If the Developer does not reimburse the City for any cost the City incurred <br />for such work within 10 business days, the City may draw down the Security to pay any costs. No <br />development, utility or street construction will be allowed, and no building permits will be issued <br />by the City unless the Subdivision is in full compliance with the approved erosion control plan. <br />If the City issues building permits before the acceptance of public Subdivision