My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#06 - Northstar 1st Add DA
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
03-19-24
>
#06 - Northstar 1st Add DA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2025 11:59:51 AM
Creation date
8/16/2024 2:10:24 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> 15 <br />LA515\112\937837.v1 <br />Developer is: $315,000.00. <br />In addition, a sewer connection charge in the amount of $1,000.00 per REC, a <br />Metropolitan Council sewer availability charge in the amount of $2,485.00 per REC, and a water <br />connection charge in the amount of $1,000.00 per REC will be payable by the Developer and <br />collected by the City at the time the City issues a building permit for each building with the <br />development. <br />25. STREET LIGHTS. The Developer is responsible for the cost of street light installation <br />consistent with a street lighting plan approved by the City. Before the City signs the final plat, the <br />Developer shall post a Security for street light installation consistent with the approved plan. The <br />required Security is $42,000 and consists of 7 decorative lights at $6,000 each. The Developer <br />shall also pay the City $395/light ($2,765) to reimburse the City for the first year operating costs <br />for the street lights. <br />26. WETLAND MITIGATION. The Developer shall complete wetland mitigation/restoration <br />in accordance with the approved Plans and in accordance with any applicable Watershed or <br />agency permits. If the mitigation work is found to be incomplete or restoration is unsuccessful, <br />the City may draw down the Security at any time during the warranty period to perform the work <br />if the Developer fails to take corrective measures after being provided reasonable notice by the <br />City. <br />27. BUILDING PERMITS/CERTIFICATES OF OCCUPANCY. <br />A. The City will not issue any building permits for any lot within the Subdivision, or within <br />a completed phase of the Subdivision in a City preapproved phasing plan, until such <br />time that sanitary sewer, water, storm sewer, curbing and one lift of asphalt has been <br />installed and tested for all public streets; boulevard grading has been completed <br />within the entire right-of-way (without hold down grading for the future sidewalk or <br />any other improvements); street and traffic control signs are installed; property
The URL can be used to link to this page
Your browser does not support the video tag.