Laserfiche WebLink
<br /> 16 <br />LA515\112\937837.v1 <br />monuments have been installed, grading as-built plans have been submitted and <br />approved by the City, and the Management Plan for the Stormwater Reuse Irrigation <br />System has been submitted and approved by the City. A “preapproved phasing <br />plan” is defined as a phased construction plan that has been submitted by the <br />Developer and approved by the City in advance of the preconstruction meeting for <br />the Subdivision. Once the construction has started, the City will not consider <br />revisions to the phasing plan for the purpose of issuing building permits. <br />B. The City may issue up to a total of 5 building permits for a “Model Home” if authorized <br />by the City Planning Director before the completion of the Subdivision Improvements <br />described in paragraph 27 (A) above, however, the Model Home Lot (as hereinafter <br />defined) shall have the following in place before the City will allow construction of <br />the Model Home to proceed: <br />1. Adequate safe public access for emergency services and contractors, including <br />a paved bituminous road to the building pad for the Model Home that is sufficient <br />to allow construction to proceed; <br />2. A grading as-built plan approved by the City for the lot identified (the “Model <br />Home Lot”) to include the Model Home and all downstream drainage facilities; <br />3. All storm water drainage facilities that include and are downstream from the <br />Model Home Lot are in place, meet the approved project plans, and are verified <br />by the City; and <br />4. The Developer shall install adequate parking, and sanitary sewer and municipal <br />water to the Model Home Lot. <br />C. The City will not issue a certificate of occupancy for any Model Home until: <br />1. The Model Home Lot has paved street access, parking, and circulation and <br />meet all City Code Standards;