Laserfiche WebLink
    PAGE 2 of 2  <br />d. Example. Oak‐Land School Building SAC determination by Met Council = 140 SAC units (est.)   <br />i. Connection Fees = ($3,000 + $1,000 + $2,485) x 140 SAC units. $907,900.  <br />e. Example. Lake Elmo Elementary School @ 148,000 SF is 129 SAC units (est.)   <br />i. Connection Fees = $836,565.  <br />  <br />WATER  <br />1. Water Availability Charge (WAC) = $3,000 per WAC unit (based on Met Council SAC  <br />Determination: 1 SAC = 1 WAC).  <br />2. Water Connection Charge = $1,000 per WAC unit.  <br />3. Example. Oak‐Land School Building WAC determination by Met Council = 140 WAC units (est.)   <br />a. Connection Fees = ($3,000 + $1,000) x 140 SAC units. $560,000 + Meter Fee (based on  <br />size).  <br />4. Example. Lake Elmo Elementary School @ 148,000 SF is 129 SAC units (est.)   <br />a. Connection Fees = $516,000 + Meter Fee.  <br />  <br />3. Infrastructure ownership and maintenance responsibilities.  <br />a. City owns and maintains public infrastructure (infrastructure used by more than one property  <br />owner).  <br />b. City owns/maintains all fire hydrants and watermain lines feeding each fire hydrant.  <br />c. Infrastructure constructed for sole use of property owner remains privately owned and  <br />maintained. This includes lift stations and forcemains.  <br />  <br />SANITARY SEWER CONNECTION INFRASTRUCTURE IMPROVEMENTS  <br />1. Option 1. Combined sewer project with new Lake Elmo Elementary School Build.  <br />a. Privately owned LS/FM to Elementary School Site (5,700 LF).  <br />b. LS = $450K. FM = $70/LF. $1.1M with 30% soft costs and contingency.  <br />c. Elementary School (LS + 3,300 LF FM). $900K with 30% soft costs and contingency.  <br />d. Add Connection Fees at time of each building permit.    <br />  <br />2. Option 2. Privately owned LS/FM to east manhole on 5th Street (6,000 LF).  <br />a. LS = $450K. FM = $70/LF. $1.1m with 30% soft costs and contingency.  <br />b. Add Connection Fees at time of building permit.    <br />  <br />3. Option 3. Private Gravity Sewer to Ex. RGC LS + Public system LS/FM upgrades.  <br />a. Privately owned Gravity sewer (1,400 LF) to Ex. RCG LS. $250K.  <br />b. Upgrade RCG LS and replace ex. Forcemain (7,400 LF). $900k.  <br />c. Future Elementary School (LS + 200 LF FM). $600K with 30% soft costs and contingency.  <br />d. Add Connection Fees at time of each building permit.    <br />  <br />CITY WATER CONNECTION INFRASTRUCTURE IMPROVEMENTS  <br />1. Public owned maintained watermain from 10th Street (CSAH 19) and Palmer Drive intersection.  <br />a. Watermain with Hydrants (3600 LF) = $520K.  <br />b. Add Connection Fees at time of connection/building permit.    <br />  <br />