<br />& PLANNED UNIT DEVELOPMENT (PUD) FINAL PLAN APPLICATION <br />15. The applicant or developer shall enter into a separate grading agreement with the City <br />before starting any grading activity in advance of final plat/ PUD approval. The City <br />Engineer shall review any grading plan that is submitted in advance of a final plat or final <br />PUD, and said plan shall document the extent of any proposed grading on the site. <br /> <br />16. That the Applicant must submit the final plat within 180 days after City Council approval <br />of the preliminary plat or approval of the preliminary plat shall be considered <br />a request for a time extension is submitted in writing and approved by the City Council. <br /> <br /> <br />Applicant Response to City Engineer’s Memo dated November 30, 2023 <br /> <br />PRELIMINARY PLAT/SITE PLANS <br /> <br />1. The Preliminary Plat must be revised to clarify all <br />The Preliminary Plat has been prepared using inconsistent line types with no labeling of <br />lot lines and easement lines. The <br />depict all Lot and Block boundaries, all Outl <br />all proposed easement lines. Right <br /> <br />Applicant Response <br />approved during the preliminary PUD process. See Final <br /> <br />2. The Preliminary Plat and Plans must be revised to show Outlot ownership and dedication. <br />Outlot A must be shown on the Preliminary Plat and Preliminary Plans as city owned for <br />stormwater management. <br /> <br />Applicant Response <br />approved during the preliminary PUD process. See Final Plat. <br /> <br />3. The Preliminary Plat and Plans must be revised to incorporate all required easements <br />consistent with the city engineering design standards, including all required utility <br />easements and all required easements over <br />(including catch basin inlets). Additional drainage and utility easement <br />cover the 100‐year HWL at CBMH‐206 and to maintain 15 ft. in each direction from <br />structure CBMH 302A. <br /> <br />Applicant Response <br /> <br />4. The Site Plans must be revised to remove all easement encroachments. Drainage and <br />utility easement encroachments are shown for the patios for Block 2: Units 13 <br />site plans must be revised to remove <br />any rear doorways to these Units since the easements <br />building structure. <br /> <br />FINAL PLAT APPLICATION <br />& PLANNED UNIT DEVELOPMENT (PUD) FINAL PLAN APPLICATION <br /> <br />or developer shall enter into a separate grading agreement with the City <br />before starting any grading activity in advance of final plat/ PUD approval. The City <br />Engineer shall review any grading plan that is submitted in advance of a final plat or final <br />and said plan shall document the extent of any proposed grading on the site. <br />16. That the Applicant must submit the final plat within 180 days after City Council approval <br />of the preliminary plat or approval of the preliminary plat shall be considered <br />a request for a time extension is submitted in writing and approved by the City Council. <br />Applicant Response to City Engineer’s Memo dated November 30, 2023 <br />PRELIMINARY PLAT/SITE PLANS <br />The Preliminary Plat must be revised to clarify all proposed Lot and Block boundaries. <br />has been prepared using inconsistent line types with no labeling of <br />lot lines and easement lines. The Preliminary Plat document must be revised to clearly <br />depict all Lot and Block boundaries, all Outlot boundaries, all proposed right <br />all proposed easement lines. Right‐of‐way and easement widths must be labeled. <br />Applicant Response: Satisfied. This was addressed and preliminary plat <br />approved during the preliminary PUD process. See Final Plat. <br />The Preliminary Plat and Plans must be revised to show Outlot ownership and dedication. <br />shown on the Preliminary Plat and Preliminary Plans as city owned for <br />stormwater management. <br />Applicant Response: Satisfied. This was addressed and preliminary plat <br />approved during the preliminary PUD process. See Final Plat. <br />The Preliminary Plat and Plans must be revised to incorporate all required easements <br />city engineering design standards, including all required utility <br />easements and all required easements over all 100‐year high water levels on site <br />(including catch basin inlets). Additional drainage and utility easement <br />‐year HWL at CBMH‐206 and to maintain 15 ft. in each direction from <br />Applicant Response: Satisfied. Please see Sheets 5 and 6. <br />The Site Plans must be revised to remove all easement encroachments. Drainage and <br />encroachments are shown for the patios for Block 2: Units 13 <br />plans must be revised to remove all encroachments and must be revised to eliminate <br />any rear doorways to these Units since the easements are proposed up to the physical <br />& PLANNED UNIT DEVELOPMENT (PUD) FINAL PLAN APPLICATION <br />or developer shall enter into a separate grading agreement with the City <br />before starting any grading activity in advance of final plat/ PUD approval. The City <br />Engineer shall review any grading plan that is submitted in advance of a final plat or final <br />and said plan shall document the extent of any proposed grading on the site. <br />16. That the Applicant must submit the final plat within 180 days after City Council approval <br />of the preliminary plat or approval of the preliminary plat shall be considered void unless <br />a request for a time extension is submitted in writing and approved by the City Council. <br />Applicant Response to City Engineer’s Memo dated November 30, 2023 <br />proposed Lot and Block boundaries. <br />has been prepared using inconsistent line types with no labeling of <br />Preliminary Plat document must be revised to clearly <br />boundaries, all proposed right‐of‐way and <br />must be labeled. <br />preliminary plat <br />The Preliminary Plat and Plans must be revised to show Outlot ownership and dedication. <br />shown on the Preliminary Plat and Preliminary Plans as city owned for <br />and preliminary plat <br />The Preliminary Plat and Plans must be revised to incorporate all required easements <br />city engineering design standards, including all required utility <br />‐year high water levels on site <br />(including catch basin inlets). Additional drainage and utility easement is required to <br />‐year HWL at CBMH‐206 and to maintain 15 ft. in each direction from <br />The Site Plans must be revised to remove all easement encroachments. Drainage and <br />encroachments are shown for the patios for Block 2: Units 13‐18. The <br />all encroachments and must be revised to eliminate <br />are proposed up to the physical