My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#19 - At Home Apartments Final Plat and PUD
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
05-21-24
>
#19 - At Home Apartments Final Plat and PUD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2025 2:04:35 PM
Creation date
8/16/2024 2:23:11 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />& PLANNED UNIT DEVELOPMENT (PUD) FINAL PLAN APPLICATION <br />4. Rate and volume control requirements must be met for all points of discharge from the <br />site. The storm water management plan must be revised <br />discharge to 39th Street storm <br /> <br />Applicant Response <br /> <br />5. The SWMP must be revised to provide a summary table of the 100 <br />for each BMP, and for each catch basin low point. The grading plans must be revised to <br />show the 100‐year HWL elevation at <br />HWL contour. A note must be shown with the table <br />point 100‐year HWL was determined using the limiting inlet capacity and <br />capacity. <br /> <br />Applicant Response <br />determined using the limiting inlet capacity. <br /> <br />6. The proposed BMP infiltration <br />must be dedicated to city ownership for stormwater management. Outlot ownership must <br />be shown on the Preliminary Plat <br />plan must be revised to in <br /> <br />Applicant Response <br /> <br />7. Overland emergency overflow (EOF) elevations are required throughout the site, <br />requiring a system of <br />structures must maintain 1 <br /> <br />Applicant Response: <br /> <br />8. Approval of the preliminary grading plans for the development is contingent upon all <br />grading plans being reviewed and approved by the City Engineer prior to the start <br />grading or construction. (a) <br />as‐built grade. Design grades must exceed <br />grading plans must be revised accordingly. <br />the proposed approved grading plan for the Lil Explorers <br />project designs are compatible. <br />100‐year HWL elevation/contour for all localized <br />protected by drainage and utility easement dedicated on the Plat. <br />control plans to show double silt fence around all BMPs and all stock <br />Landscaping improvements must be closely coordinated with the preparation of the <br />construction plans to ensure that tree plantings do not encroach drainage swales, EOF <br />flow paths, utility easements, and <br /> <br />Applicant Response: Satisfied. Please see Sheets 16 & 17. <br />FINAL PLAT APPLICATION <br />& PLANNED UNIT DEVELOPMENT (PUD) FINAL PLAN APPLICATION <br /> <br />Rate and volume control requirements must be met for all points of discharge from the <br />water management plan must be revised as the plan currently shows the <br />discharge to 39th Street storm sewer being exceeded in the post development condition. <br />Applicant Response: Satisfied. Please see SWMP Report. <br />The SWMP must be revised to provide a summary table of the 100 ‐year HWL elevatio <br />for each catch basin low point. The grading plans must be revised to <br />‐year HWL elevation at each catch basin low point including the 100 <br />HWL contour. A note must be shown with the table indicating that the catch basin <br />‐year HWL was determined using the limiting inlet capacity and <br />Applicant Response: Satisfied. Please see Sheets 5/6 and 16/17. <br />determined using the limiting inlet capacity. <br />The proposed BMP infiltration basin has been placed in Outlot A as required. Outlot A <br />to city ownership for stormwater management. Outlot ownership must <br />be shown on the Preliminary Plat and on the Grading, Utility and Site Plans. The grading <br />plan must be revised to indicate that the storm water basin is an infiltration basin. <br />Applicant Response: Satisfied. Please see Sheets 5/6 and 16/17 <br />Overland emergency overflow (EOF) elevations are required throughout the site, <br /> interconnecting drainage ways. Low openings for adjacent <br />structures must maintain 1‐foot above any adjacent EOF in the as‐built condition. <br />Response: Satisfied. Please see Sheets 16 & 17. <br />Approval of the preliminary grading plans for the development is contingent upon all <br />reviewed and approved by the City Engineer prior to the start <br />grading or construction. (a) All drainage swales must be designed to meet a minimum 2% <br />‐built grade. Design grades must exceed 2% to account for construction toleran <br />grading plans must be revised accordingly. (b) The grading plans must be revised to show <br />the proposed approved grading plan for the Lil Explorers daycare to ensure the two <br />project designs are compatible. (c) Preliminary plat approval must be conti <br />‐year HWL elevation/contour for all localized low points and catch basins being <br />protected by drainage and utility easement dedicated on the Plat. (d) Revise the erosion <br />control plans to show double silt fence around all BMPs and all stock <br />Landscaping improvements must be closely coordinated with the preparation of the <br />to ensure that tree plantings do not encroach drainage swales, EOF <br />flow paths, utility easements, and pond access routes. <br />Response: Satisfied. Please see Sheets 16 & 17. <br />& PLANNED UNIT DEVELOPMENT (PUD) FINAL PLAN APPLICATION <br />Rate and volume control requirements must be met for all points of discharge from the <br />as the plan currently shows the <br />sewer being exceeded in the post development condition. <br />‐year HWL elevation <br />for each catch basin low point. The grading plans must be revised to <br />each catch basin low point including the 100‐year <br />indicating that the catch basin low <br />‐year HWL was determined using the limiting inlet capacity and not the pipe <br />and 16/17. HWL’s were <br />basin has been placed in Outlot A as required. Outlot A <br />to city ownership for stormwater management. Outlot ownership must <br />and on the Grading, Utility and Site Plans. The grading <br />basin is an infiltration basin. <br /> <br />Overland emergency overflow (EOF) elevations are required throughout the site, <br />. Low openings for adjacent <br />‐built condition. <br />Approval of the preliminary grading plans for the development is contingent upon all <br />reviewed and approved by the City Engineer prior to the start of any <br />All drainage swales must be designed to meet a minimum 2% <br />2% to account for construction tolerances. The <br />The grading plans must be revised to show <br />daycare to ensure the two <br />Preliminary plat approval must be contingent upon the <br />low points and catch basins being <br />Revise the erosion <br />control plans to show double silt fence around all BMPs and all stock pile sites. (e) <br />Landscaping improvements must be closely coordinated with the preparation of the <br />to ensure that tree plantings do not encroach drainage swales, EOF
The URL can be used to link to this page
Your browser does not support the video tag.