Laserfiche WebLink
<br />& PLANNED UNIT DEVELOPMENT (PUD) FINAL PLAN APPLICATION <br /> <br />9. The storm sewer system shall be designed to maintain the city standard minimum pipe <br />cover of 3.0 feet under all pavement surfaces, unless approved by the City Engineer. <br />Drain tile is required as part of the <br />in the street. Drain tile considerations may impact the <br />requirements at low points. Drain tile inverts must be shown at all catch <br />points. <br /> <br />Applicant Response <br /> <br />10. The maximum curb run prior to a catch basin is 350 feet. <br /> <br />Applicant Response <br /> <br />11. Storm sewer pipe located outside of the public right <br />30‐ft easements centered over the <br />footings, retaining walls, trees, or <br />revised to remove all drainage and utility easement encroachments from the <br />Units 13‐18.  Additional e <br /> <br />Applicant Response <br />addressed this comment. With the street width reduction from 32’ to 28’ the <br />building locations were adjusted allow the patio locations to move. At the time of <br />adjustment the patios were located 1 <br />encroached into the easement area by 4’. Staff recommended that the easement <br />area for this particular location be reduced by 4’ to resolve the encroachment <br />issue. For this part of the development, the storm water eas <br />thereby resolving any encroachment issues for Block 2: Units 13 <br /> <br />With regard to the additional easement area required over CBMH 302A.12, please <br />see Sheet 28. <br /> <br />12. The street profiles must be revised to create low points on Street A <br />immediately adjacent to <br />The proposed valley gutters must be <br />Wildflower Drive relocated. An additional catch basin is <br />CBMH 302A and CBMH 302, to accommodate required drainage low point. <br /> <br />Applicant Response <br /> <br />13. An additional catch basin is required in the cul <br />cul‐de‐sac drainage. <br /> <br />Applicant Response <br />FINAL PLAT APPLICATION <br />& PLANNED UNIT DEVELOPMENT (PUD) FINAL PLAN APPLICATION <br /> <br />The storm sewer system shall be designed to maintain the city standard minimum pipe <br />under all pavement surfaces, unless approved by the City Engineer. <br />Drain tile is required as part of the city standard street section at all localized low points <br />in the street. Drain tile considerations may impact the storm sewer design and depth <br />requirements at low points. Drain tile inverts must be shown at all catch <br />sponse: Satisfied. Please see Sheets 28 to 30. <br />The maximum curb run prior to a catch basin is 350 feet. <br />Applicant Response: Satisfied. <br />Storm sewer pipe located outside of the public right‐of‐way must maintain minimum <br />centered over the pipe/structure without encroachments from buildings, <br />footings, retaining walls, trees, or other permanent structures.  The site plans must be <br />revised to remove all drainage and utility easement encroachments from the <br /> Additional easement area is required over CBMH 302A. <br />Applicant Response: Per continued discussions with city staff, the Applicant has <br />addressed this comment. With the street width reduction from 32’ to 28’ the <br />building locations were adjusted allow the patio locations to move. At the time of <br />adjustment the patios were located 11’ from the storm sewer pipe, but still <br />encroached into the easement area by 4’. Staff recommended that the easement <br />area for this particular location be reduced by 4’ to resolve the encroachment <br />issue. For this part of the development, the storm water easement area will be 26’ <br />thereby resolving any encroachment issues for Block 2: Units 13- <br />With regard to the additional easement area required over CBMH 302A.12, please <br />The street profiles must be revised to create low points on Street A <br /> Wildflower Drive to better facilitate the intersection drainage. <br />The proposed valley gutters must be removed and the existing catch basins along <br />Wildflower Drive relocated. An additional catch basin is required on Stre <br />CBMH 302A and CBMH 302, to accommodate required drainage low point. <br />Applicant Response: Satisfied. Please see Sheet 31 & 32. <br />An additional catch basin is required in the cul‐de‐sac of Street B to improve the <br />Response: Satisfied. Please see Sheet 27 and CBMH-304A. <br />& PLANNED UNIT DEVELOPMENT (PUD) FINAL PLAN APPLICATION <br />The storm sewer system shall be designed to maintain the city standard minimum pipe <br />under all pavement surfaces, unless approved by the City Engineer. <br />standard street section at all localized low points <br />storm sewer design and depth <br /> basin connection <br />‐of‐way must maintain minimum <br />pipe/structure without encroachments from buildings, <br /> The site plans must be <br />revised to remove all drainage and utility easement encroachments from the patios for <br />12. <br />Per continued discussions with city staff, the Applicant has <br />addressed this comment. With the street width reduction from 32’ to 28’ the <br />building locations were adjusted allow the patio locations to move. At the time of <br />1’ from the storm sewer pipe, but still <br />encroached into the easement area by 4’. Staff recommended that the easement <br />area for this particular location be reduced by 4’ to resolve the encroachment <br />ement area will be 26’ <br />-18. <br />With regard to the additional easement area required over CBMH 302A.12, please <br />The street profiles must be revised to create low points on Street A and Street B <br />Wildflower Drive to better facilitate the intersection drainage. <br />removed and the existing catch basins along <br />required on Street A, between <br />CBMH 302A and CBMH 302, to accommodate required drainage low point. <br />‐de‐sac of Street B to improve the <br />304A.