My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#19 - At Home Apartments Final Plat and PUD
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
05-21-24
>
#19 - At Home Apartments Final Plat and PUD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2025 2:04:35 PM
Creation date
8/16/2024 2:23:11 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />& PLANNED UNIT DEVELOPMENT (PUD) FINAL PLAN APPLICATION <br /> <br />5. The developer will be responsible to place hydrants and water system valves internal to <br />the site as determined by the Lake Elmo Public Works Director and Fire Department. At <br />a minimum, an additional gate <br />extension to maintain the maximum number of <br /> <br />Applicant Response <br /> <br />6. The plans must be revised such that all water/sewer services are installed perpendicular to <br />the main with no bends. When <br />outside of the paved street. <br /> <br />Applicant Response <br /> <br />7. The watermain construction Plans must be prepared meeting all city design standards and <br />plan format requirements, including the use of city standard plan notes, details and <br />specifications. <br /> <br />Applicant Response <br /> <br />MUNICIPAL SANITARY SEWER <br /> <br />1. The proposed site is located in the Old Village MUSA area in the city’s Comprehensive <br />Plan and will discharge to the MCES Cottage Grove Ravine Interceptor. <br /> <br />Applicant Response <br /> <br />2. Sanitary sewer service is available to the site with a connection to an existing 8 <br />sanitary sewer stub located along 39th Street North. <br /> <br />Applicant Response <br /> <br />3. The developer will be responsible to extend sanitary sewer service into the development <br />at the developer’s sole cost with the extension of an 8 <br /> <br />Applicant Response <br /> <br />4. No sanitary sewer oversizing is <br />need to be extended to serve adjacent properties. <br /> <br />Applicant Response <br /> <br />FINAL PLAT APPLICATION <br />& PLANNED UNIT DEVELOPMENT (PUD) FINAL PLAN APPLICATION <br /> <br />loper will be responsible to place hydrants and water system valves internal to <br />determined by the Lake Elmo Public Works Director and Fire Department. At <br />a minimum, an additional gate valve must be installed along the easterly watermain <br />extension to maintain the maximum number of services for isolation at 20 units. <br />Applicant Response: Satisfied. Please see Sheet 26. <br />The plans must be revised such that all water/sewer services are installed perpendicular to <br />no bends. When the use of bends is unavoidable, they must be located <br />outside of the paved street. <br />Applicant Response: This has been satisfied to the greatest extent pos <br />The watermain construction Plans must be prepared meeting all city design standards and <br />requirements, including the use of city standard plan notes, details and <br />Applicant Response: Satisfied. <br />MUNICIPAL SANITARY SEWER <br />The proposed site is located in the Old Village MUSA area in the city’s Comprehensive <br />discharge to the MCES Cottage Grove Ravine Interceptor. <br />Applicant Response: Satisfied. <br />Sanitary sewer service is available to the site with a connection to an existing 8 <br />located along 39th Street North. <br />Applicant Response: Satisfied. <br />The developer will be responsible to extend sanitary sewer service into the development <br />sole cost with the extension of an 8‐inch PVC sanitary sewer main. <br />Applicant Response: Satisfied. <br />No sanitary sewer oversizing is applicable for this development and the sewer does not <br />to serve adjacent properties. <br />Applicant Response: Satisfied. <br />& PLANNED UNIT DEVELOPMENT (PUD) FINAL PLAN APPLICATION <br />loper will be responsible to place hydrants and water system valves internal to <br />determined by the Lake Elmo Public Works Director and Fire Department. At <br />valve must be installed along the easterly watermain <br />services for isolation at 20 units. <br />The plans must be revised such that all water/sewer services are installed perpendicular to <br />the use of bends is unavoidable, they must be located <br />to the greatest extent possible. <br />The watermain construction Plans must be prepared meeting all city design standards and <br />requirements, including the use of city standard plan notes, details and <br />The proposed site is located in the Old Village MUSA area in the city’s Comprehensive <br /> <br />Sanitary sewer service is available to the site with a connection to an existing 8 ‐inch <br />The developer will be responsible to extend sanitary sewer service into the development <br />‐inch PVC sanitary sewer main. <br />applicable for this development and the sewer does not
The URL can be used to link to this page
Your browser does not support the video tag.