  <br />    PAGE 2 of 3  <br />7. Site Access. Access to the proposed subdivision is shown from a new public street, 39th Street Court,  <br />connecting to Wildflower Drive and extending both west and east from Wildflower Drive. The new streets  <br />are proposed as a 350‐ft long cul‐de‐sac to the west and a 550‐ft long cul‐de‐sac to the east. The proposed  <br />access  is  acceptable  from  an  access  management  and  sight  line  perspective.  Revisions  to  the  new  <br />intersection at Wildflower Drive will be required to relocate existing storm sewer catch basins so that they  <br />are located outside of the new intersection.  <br />8. Secondary access is not required and dead‐end cul‐de‐sac streets have been accepted by the City as part of  <br />the Preliminary Plat approval.  <br />9. Each street is shown to be 28‐ft. wide within a 60‐ft right‐of‐way. A typical section was submitted that  <br />shows the proposed street and right‐of‐way widths meeting these requirements.   <br />10. Sidewalks are shown along both sides of the street as required in multi‐family subdivisions. A sidewalk  <br />connection to the trail along 39th Street is also shown as required to enhance pedestrian connectivity.  <br />11. A new 6‐ft. wide concrete sidewalk is shown along the east side on Wildflower Drive, along the full extents  <br />of the development parcel and connecting to the existing sidewalk at Sunflower Lane as required.    <br />12. Driveways. Final Plat approval must be contingent upon all driveways being installed in accordance with all  <br />City ordinances, including minimum distance from intersections, driveway angles installed at 90‐degrees as  <br />they cross public right‐of‐way, and distance between driveways.  <br />13. It is recommended that the Final Plat approval include a condition to require a design/construction quality  <br />control plan for all driveways that incorporates staking and City inspections prior to driveway construction  <br />to avoid unacceptable design changes at the building permit phase or field changes by contractors.  <br />14. Building and garage setbacks are shown at 25 feet from the right‐of‐way as required. The minimum 25 feet  <br />setback must be maintained for all plan revisions to avoid vehicle overhang into the sidewalk path.  <br />15. The subdivision improvements are subject to a storm water management plan (SWMP) meeting State,  <br />Valley Branch Watershed District (VBWD) and city rules. Storm water facilities proposed as part of the  <br />development to meet State and watershed permitting requirements must be constructed in accordance  <br />with the City Engineering Design Standards Manual dated January 2022.  <br />16. Public watermain and sanitary sewer are available to serve the subdivision with existing utilities located in  <br />the right‐of‐way of 39th Street North. The developer will be responsible for all costs to extend utilities  <br />within and throughout the subdivision to fully serve each proposed lot. Hydrant locations and system valves  <br />must be placed as directed by the Lake Elmo Public Works and Fire Departments. All internal site hydrants,  <br />and watermains feeding any hydrant, will remain City owned and operated. No utility pipe oversize costs  <br />apply for this Subdivision.  <br />17. Phasing Plan. A condition of Final Plat approval must include the requirement for all utilities, stormwater  <br />management, street and sidewalk improvements including curb and gutter and the first lift of asphalt,  <br />sidewalks, and any off‐site public improvements to be constructed and accepted by the City prior to  <br />issuance of any building permits, including model homes. The development sequencing will be important  <br />due to a single site access along each street combined with small, tight construction sites.  <br />18. No construction parking and staging will be allowed along 39th Street or Wildflower Drive.  <br />19. All off‐site permanent and temporary easements, if necessary to  construct  the  proposed  subdivision  <br />improvements, must be acquired and provided to the City prior to the approval of the Final Construction  <br />Plans. Each easement, if needed, must be provided in the City standard form of easement agreement.  <br />  <br />FINAL CONSTRUCTION PLANS & SPECIFICATIONS  <br /> Final Construction Plans and Specifications must be prepared in accordance with the City Engineering  <br />Design Standards Manual dated January 2022, using City standard details, plan notes and specifications and  <br />meeting City Engineering Design Guidelines, unless approved otherwise by the City Engineer.  <br /> Final Construction Plans and Specifications must be revised in accordance with the Construction Plan  <br />engineering review memorandum dated April 22, 2024, and all subsequent engineering plan reviews.   <br /> Final Plat approval must be contingent upon the applicant completing off‐site turn lane improvements along  <br />Wildflower Drive. Improvements are be completed meeting City design standards.