My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#20 - Bridgewater Village Final Plat
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
05-21-24
>
#20 - Bridgewater Village Final Plat
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2025 2:08:15 PM
Creation date
8/16/2024 2:23:19 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Current Legal Description: See article 1 <br /> <br />c) Final Subdivision and Lot Information: <br /> <br />Final Plat Name: Bridgewater Village <br /> <br />Proposed Lots: Four commercial lots and multiple outlots for stormwater management and <br />future residential use. <br /> <br />Per meetings with City of Lake Elmo Parks Commission it was determined that this <br />subdivision is not to have a dedicated park or public open space. <br /> <br />Proposed lot areas listed below. Note areas have been rounded for clarity. Plat documents <br />show detailed acreages. <br /> <br />Overall Project Area: 1,051,399 SF 24.136 AC <br /> Lot 1, Block 1: 71,665 SF 1.64 AC <br /> Lot 1, Block 2: 71,302 SF 1.64 AC <br /> Lot 2, Block 2: 79,352 SF 1.82 AC <br /> Lot 3, Block 3: 82,871 SF 1.90 AC <br /> OUTLOT A: 35,587 SF 0.82 AC <br /> OUTLOT B: 52,569 SF 1.21 AC <br /> OUTLOT C: 67,100 SF 1.54 AC <br /> OUTLOT D: 274,980 SF 6.31 AC <br /> OUTLOT E: 102,154 SF 2.35 AC <br /> Dedicated ROW: 213,819 SF 4.91 AC <br /> <br />i) Final exact area calculations of parks, trails, and any other dedicated public open <br />space; and estimated values of all dedicated land and improvements (trails, park <br />equipment, sports fields, etc.). <br /> <br />Per feedback from the City of Lake Elmo this site is not expected to be a favorable <br />location for a park and is not being proposed at this time. Trail is being added per city <br />direction within the proposed or existing public ROW area. <br />ii) Final exact area calculations of wetlands and buffers. <br /> <br />There are no wetlands or wetland buffers on site . <br />iii) Final proposed area calculations for all dedicated right -of-ways. <br /> <br />Total right-of-way to be dedicated to city is 4.91 acres. <br />iv) Proposed legal descriptions for: all lots, easements to be created (if not being <br />dedicated on the plat), and easements to be vacated (if any). <br /> <br />Lot 1, Block 1, BRIDGEWATER VILLAGE, according to the recorded plat thereof, Washington <br />County, Minnesota
The URL can be used to link to this page
Your browser does not support the video tag.